BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 23, 2025 at 8:00 PM

Updated July 24, 2025

Site work for a water / sewer project in Grants Pass, Oregon. Completed plans call for site work for a water / sewer project.

The proposed work includes approximately the following: This project will replace 5' of 6-inch clay pipe at a depth of 18'. (1) new 4" sewer Service wye and new 4" pvc service lateral from main to connect existing Homeowners 4" concrete sewer service at row. City of grants pass will supply All 6" and 4" couplers, wye, fittings and pvc pipe. There will be NO MANDATORY PREBID MEETING, but any proposers are encouraged to reach out to the City Wastewater Collections Superintendent Shane Macuk at smacuk@cityofgrantspass.gov with specific questions. Proposers must be prequalified in conformance with Oregon Revised Statute 279C.430 or the Grants Pass Municipal Code. A prequalification form must be submitted to the CITY OF GRANTS PASS ENGINEERING DIVISION, five calendar days prior to the proposal opening date in order for the proposal to be considered. ALL PREQUALIFICATION FORMS ARE DUE NO LATER THAN 5:00 P.M. ON WEDNESDAY JUNE 25, 2025. If the prequalification form is not submitted five calendar days prior to the proposal opening date or the proposer has not prequalified with the City within the previous 12 months, the proposal will be automatically rejected, remain unopened, marked as "Rejected" and filed with the other proposals. The class or classes of work for which proposers must prequalify are the following: Temporary Features And Appurtenances, Road Work, Drainage And Sewers If the proposer has prequalified with the City within one year prior to the proposal opening, and such prequalification is for the call of work as stated above with no substantial change, then it will not be necessary to prequalify again for this proposal. This is a Non-Prevailing Wage (BOLI) Project. The City of Grants Pass may reject any proposal not in compliance with all public proposal procedures and requirements, may waive any irregularities, and may reject for good cause any or all proposal upon a finding of the City it is in the public interest to do so. The work shall be completed no later than 15 (fifteen) days after a written "Notice to Proceed" is given to the Contractor by City. If you have any questions, please contact Shane Macuk at (541) 450-6110 or smacuk@grantspassoregon.gov

Award

Water / Sewer

$60,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
15
Bidding Soon
129
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2025

August 1, 2025

Project location map

822 SW 5th St, Grants Pass, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.