Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 8, 2025 at 8:00 PM
Updated August 9, 2025
Site work and renovation of a civil project in Auburn, California. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
In accordance with plans and specifications prepared by West Yost Associates, the Work includes the furnishing of all labor, materials, tax, equipment and services for the construction and completion of a new booster pump station adjacent to the existing Foothill Water Treatment Plant Backwash tank; retrofit of the existing Foothill Pump Station to replace part of the exposed piping and two new 10" pressure reducing valves; process electrical, control instrumentation; SCADA control facilities and miscellaneous work for complete and operational facilities. Questions shall be delivered by e-mail or U.S. Mail by 5:00 PM, July 23, 2025 to: Cina Seyedkazemi Placer County Water Agency, Engineering Division, P.O. Box 6570, Auburn, CA 95604 e-mail: cseyedkazemi@pcwa.net Event note: A project walk-through will follow. A sign-in sheet will be available up until 10:15 a.m. only. Attendance at the entire pre-bid meeting and walk-through is mandatory for bidding. Bids received from Bidders who did not sign the sign-in sheet and attend the meeting and walk-through will be returned to the Bidder unopened. Attendance by subcontractors is not mandatory, but all interested prospective subcontractors are encouraged to attend. The Owner will cause to be transmitted to all recipients of Contract Documents such Addenda as Owner considers necessary in response to questions raised at the meeting and walk-through. Oral statements not confirmed by Addenda may not be relied upon and are not binding or legally effective. Except for mandatory walk-through, no other access to the project site will be granted pre-bid without the Owner's approval. During all site visits the Bidder must be accompanied full time by an authorized representative of the Owner. No exceptions. The estimated cost of construction is $650,000.
Bid Results
Water / Sewer
$915,934.00
Public - County
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 5, 2025
September 4, 2025
Multiple Locations, Auburn, CA
Related To This Project
Auburn, CA
Bid Date: Aug 04 2025
Auburn, CA
Bid Date: Aug 08 2025
Auburn, CA
Bid Date: Jul 07 2025
Auburn, CA
--
Auburn, CA
Bid Date: Aug 26 2025
Auburn, CA
Bid Date: Aug 29 2025
Auburn, CA
Bid Date: Jul 18 2025
Auburn, CA
Bid Date: May 29 2025
Auburn, CA
Bid Date: Jun 12 2025
Auburn, CA
Bid Date: Jun 04 2025
Auburn, CA
--
Auburn, CA
Bid Date: May 20 2025
Auburn, CA
Bid Date: May 12 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
