Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 26, 2025 at 8:00 PM
Updated June 27, 2025
Site work and paving for a road / highway in Black River Falls, Wisconsin. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
Extend the structural life of the existing asphaltic pavement that includes intersection improvements/widening and secondary structure work on B-38-48. Perpetuation project to resurface 12.03 miles on USH 141 in the Towns of Beaver, Middle Inlet, and Stephenson; and the Village of Crivitz, in Marinette County. Mill and pave USH 141. Additional work includes culvert replacements, beam guard improvements, frost heave improvements, curb/gutter repairs/replacements, and storm sewer repairs. Intersection improvements are anticipated at several intersections. The intersection of USH 141/CTH P may add dedicated left turn lanes in both NB/SB directions or the realignment of CTH P to create 4-legged intersection with single lane roundabout. The intersection of USH 141/Airport Road may dedicated left turn lanes in both directions. The intersection of USH141/Smith Creek Road may be converted to a single lant roundabout. Secondary structure work on structure B-38-48 over the Peshtigo River includes pigmented surface sealer. Anticipated Project Start Date: 11/24/2025 Anticipated Project Completion Date: 04/22/2033 Anticipated Construction Cost: $8,000,000-$8,999,999 DBE goal: DBE goal in $ 0.00 The Method of Contractor Selection Has Not Been Determined at This Time. WIDOT - NE-02 - RFP Engineering - Perpetuation - Resurfacing - USH 141 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Roads / Highways
$8,999,999.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 24, 2025
USH 141, Black River Falls, WI
Related To This Project
Black River Falls, WI
--
Black River Falls, WI
Bid Date: Aug 07 2025
Black River Falls, WI
Bid Date: Aug 12 2025
Black River Falls, WI
Bid Date: Sep 23 2025
Black River Falls, WI
Bid Date: Oct 24 2025
Black River Falls, WI
Bid Date: Dec 15 2025
Black River Falls, WI
Bid Date: Dec 18 2025
Black River Falls, WI
--
Black River Falls, WI
--
Black River Falls, WI
--
Black River Falls, WI
Bid Date: May 14 2025
Black River Falls, WI
Bid Date: Apr 14 2025
Black River Falls, WI
Bid Date: Apr 03 2025
Black River Falls, WI
Bid Date: Mar 17 2025
Black River Falls, WI
Bid Date: Mar 12 2025
Unlock Your Potential with Access to Commercial Construction Data
Sign up now to get free company and project data. No payment required.
