BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 14, 2026 at 7:00 PM

Updated January 15, 2026

This is a service / maintenance or supply contract in Wheatland, California. Contact the soliciting agency for additional information.

General work description: Consultant will be tasked with handling engineering and construction support services regarding the Forty Mile Road Pedestrian and Bicyclist Safety Project which includes a full PS&E package. The design of the project will feature a shared-use path, installation of segment lighting, K-Rail barrier, traffic signs, pavement markings, and more. In May 2024, Yuba County completed a Bicycle and Pedestrian Mobility Plan, a comprehensive planning document for bicycle and pedestrian improvements within the unincorporated County area. The Mobility Plan identified Forty Mile Road as lacking safe walking and bike riding facilities. In July 2024, Yuba County adopted a Local Roadway Safety Plan (LRSP) that systematically identified and analyzed traffic safety-related issues, and recommended projects and countermeasures to reduce collisions. The LRSP identified Forty Mile Road as a high-priority project. Subsequently, under the Safe Streets and Roads for All effort, Yuba County joined with Sutter County, and the cities of Marysville, Wheatland, Yuba City, and Live Oak to prepare a Yuba-Sutter Regional Safety Action Plan. The goal is to develop a comprehensive action plan to achieve zero deaths. During the data gathering and analysis phases of this effort, the County's consultants completed a collision review of the County's entire roadway network and identified this section of Forty Mile Road as having three fatal collisions and two serious-injury collisions involving pedestrians over the most recent three-year period. The section of Forty Mile Road between Rosser Road and the north entrance to the Hard Rock Hotel & Casino is by far the County's highest fatal and serious-injury crash concentration. Five pedestrian collisions over the most recent three-year period, three resulting in fatalities and two resulting in serious injuries, represent an immediate threat to the County's citizens and must be addressed as the County's highest priority. Yuba County applied for the (Highway Safety Improvement Project) HSIP Cycle 12 grant and were awarded based off the BCR (Benefit Cost Ratio) of the corridor that was analyzed. This grant will help go towards the safety of pedestrians, bicyclists, and motorists along this corridor by providing a shared-use path, segment lighting, thermoplastic markings, signage, and more. The County of Yuba is accepting proposals for Engineering and Construction Support Services for the Forty Mile Road Shared-Use Path Project. The project is Federally and locally funded. Funds category: Highway Safety Improvement Project (HSIP) Cycle 12. This is a cost-plus-fixed-fee and project specific contract. This project has a DBE goal of 14%, and will be tracked with the Exhibit 10-O1 and after selection with the 10-02. An Exhibit 15H Good Faith Efforts shall be filled out if goal is not met or as needed Proposed start date will be August/September, 2025 and end date is 3 years from proposed start date. Construction is expected for 2026/2027 and is anticipated to be 1 year long. For additional proposal submittal or technical information, please contact Joshua Usvat at jusvat@yuba.gov The County reserves the right to reject all proposals and issue another RFP, if it is deemed to be in the best interest of the County. Question Submission Deadline:July 28, 2025, 2:00pm Question Response Deadline:July 29, 2025, 2:00pm The method of Contractor Selection has not been Determined at this time. Project Awarded to Dokken Engineering

Conceptual

Roads / Highways

Public - County

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
319
Active Projects
159
Bidding Soon
1,382
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2026

Project location map

Forty Mile Rd, Wheatland, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.