BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 18, 2025 at 8:00 PM

Updated July 25, 2025

Site work for a bridge / tunnel in Rosenort, Manitoba. Completed plans call for site work for a bridge / tunnel.

Reference Number 0000297036 Question Acceptance Deadline 2025/07/22 12:00:00 PM CDT Removal and disposal of the existing corrugated steel culvert and placing 1- 1,370mm x 31.18m long HDPE culvert with concrete headwalls and stainless steel slide gate through the West Dike located at Floodway Rd and Rd 43 NE in the Rural Municipality of Macdonald. Completion Model The Contract Will Be Assessed Liquidated Damages in Accordance With the Specification for Liquidated Damages - Completion Specified by Working Days. Commencement of Working Days Notwithstanding Specification 13.5.2, Working Days Will Be Assessed by the Engineer Starting Ten (10) Days After Award, or on the Date on Which the Contractor Commences Work on Any Item of Work Listed Below, Whichever is Earlier. Items of Work Remove Metal Pipe Culverts Supply and Place High Density Polyethylene Culverts Liquidated Damages The Work, Excluding the Placement of Stainless Steel Slide Gates Shall Be Completed on or Before the Expiration of Forty (40) Working Days. The Placement of Stainless Steel Slide Gates Shall Be Completed on or Before the Expiration of One-hundred and Eighty (180) Calendar Days From the Culvert Installation. Daily Liquidated Damages After This Specified Time Limit Will Be Charged at the Rate of Five Hundred ($500.00) Dollars Per Working Day Until the Work is Completed. Seasonal Shutdown Date The Seasonal Shutdown Date for This Project is N/a Official bid documents must be obtained from www.merx.com

Post-Bid

Bridges / Tunnels

$500,000.00

Public - State/Provincial

Site Work

10

4

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2025

August 25, 2025

Project location map

Rd 43 N, Rosenort, MB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.