BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 3, 2025 at 8:00 PM

Updated September 4, 2025

Site work, outdoor lighting and renovation of a mixed-use development in Paducah, Kentucky. Completed plans call for the renovation of a playground / park / athletic field; for site work for a sidewalk / parking lot; and for outdoor lighting for a playground / park / athletic field.

Lighting at Dolly McNutt Memorial Plaza Question Deadline 07/03/2025 Any and all questions and requests for clarifications or information pertaining to this request for proposal shall be submitted in writing not later than to Amie Clark by email at aclark@paducahky.gov. No oral questions will be answered. SCOPE OF SERVICES The Scope of Work, including but not limited to: 1. Demolition and offsite disposal of existing light fixtures. Existing Posts are to remain for reuse. 2. New Light Fixtures a) Replace and provide 4000K LED Solar Acorn or Lantern style light fixture(s) with terminations for each post. b) Must be powder coated aluminum with heat resistant, shatter proof or tempered glass. c) Include pole adapters for new mount style d) Include light specs and all manufacturer's information. e) Include warranty information. f) Include in Base Price, pricing for single top mounted light fixture per post with mounting bracket as applicable. 3. New Light Posts a) Replace 2 light posts of similar size, material, and style of existing posts. Must be compatible for installation with existing foundations. 4. Add Alternates: a) No. 1: Side Mounted Light Fixtures 1. Three (3) side mounted light fixtures per post with mounting brackets, and recommended K for lighting style, as applicable. b) No. 2: New Power Receptacles 1. Add eight (8) 15A TR/WR GFCI Receptacles in 8 posts to include boxes, devices, covers, etc. 5. Compensation a) Using the Cost Breakdown Form enclosed, provide a proposed cost for the provision of the scope of services defined herein for the City's consideration, to include an itemized cost for services provided, services available, purchase of products and materials, freight, and any and all labor. Dolly McNutt Plaza, located in downtown Paducah, is approximately 3 acres and includes walking paths, a plaza area, and a large fountain with pool. Paducah Parks and Recreation is looking to improve visibility at night in Dolly McNutt Plaza with updated park lighting. The park has 34 existing lamp posts with either top post mounted fixtures or side post mounted fixtures. There are 2 additional lamp post foundations for poles that were damaged and taken out and will need to be replaced as part of this project with similar post and lighting.

Award

Playgrounds / Parks / Athletic Fields

$58,980.00

Public - City

Outdoor Lighting, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
72
Bidding Soon
753
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2025

August 11, 2025

Project location map

301 S 5th St, Paducah, KY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.