Published August 20, 2025 at 8:00 PM
Updated August 21, 2025
Site work and paving for a mixed-use development in Appleton, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Contract shall include 260 square feet of 6-inch concrete pavement, 1 Lighted RRFP crossing, 15 square yards of asphalt pavement, 55 square yards of site restoration, 50 linear feet of curb and gutter, 120 linear feet of pavement marking. Description of Work. a. Under this Contract, Contractor shall furnish all materials, appliances, tools, equipment, transportation, services, and all labor and superintendence necessary for the construction of the Work as described in these Technical Specifications and as shown on the Plans. The completed installation shall not lack any part that can be reasonably implied as necessary to its proper functioning or any subsidiary item that is customarily furnished, and Contractor shall deliver the installation to Owner in operating condition. b. The Work, in general, under this Contract includes the purchase, installation, and construction of all structures, equipment, and materials, including appurtenances, as indicated on the Plans. Major items of construction and services required are designated as follows: (1) Install and adjust waterlines, valves, valve boxes, flushing valves, fittings, and appurtenances; (2) Construct and adjust sanitary sewer, manholes and appurtenances; (3) Repair existing pavement affected; (4) Furnish and install all subsidiary items as necessary to complete the project; (5) Perform testing as specified on installed lines; and (6) Clean-up project area upon completion. a. Execute cutting (including excavating and backfilling), fitting or patching of the work required to: (1) Make several parts fit properly. (2) Uncover work to provide for installation of ill-timed work. (3) Remove and replace defective work. (4) Remove and replace work not conforming to requirements of the contract documents. (5) Remove samples of installed work as specified for testing. (6) Install specified work in existing construction. b. In addition to contract requirements, upon written instruction of the Engineer: (1) Uncover work to provide for observation of covered work. (2) Remove samples of installed materials for testing. (3) Remove work to provide for alteration of existing work. c. Do not endanger any work by cutting or altering the work or any part of it. d. Do not cut or alter the work of another Contractor without written consent by the Engineer. e. Prior to cutting which affects structural safety of the project, or the work of another Contractor, secure written approval by the Engineer. This section describes the excavation for all structures except pipe sewers, the backfilling around completed structures and the disposal of all excess excavated material. All operations required for the proper completion of the excavation work, including sheeting, shoring, bracing, dewatering of excavations, and compaction of backfill are included under this section. Waste material disposal consists of disposal of trees, stumps, logs, brush, roots, grass, vegetation, humus, rubbish and other objectionable matter from operations such as clearing and grubbing, excavation and grading. Unless otherwise specified, the Contractor is responsible for removal and disposal of waste material.
Award
Roads / Highways
$81,362.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 7, 2025
September 8, 2025
3805 N Freedom Rd, Appleton, WI
Related To This Project
Appleton, WI
Bid Date: Jul 23 2025
Appleton, WI
Bid Date: Aug 04 2025
Appleton, WI
Bid Date: Jul 29 2025
Appleton, WI
Bid Date: Aug 04 2025
Appleton, WI
Bid Date: Jul 30 2025
Appleton, WI
Bid Date: Jul 28 2025
Appleton, WI
Bid Date: Jul 28 2025
Appleton, WI
Bid Date: Aug 18 2025
Appleton, WI
Bid Date: Jul 08 2025
Appleton, WI
Bid Date: Jun 26 2025
Appleton, WI
Bid Date: Jul 16 2025
Appleton, WI
Bid Date: Jul 16 2025
Appleton, WI
Bid Date: Jul 16 2025
Appleton, WI
Bid Date: Jun 24 2025
Appleton, WI
Bid Date: Jun 09 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.