BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 18, 2025 at 8:00 PM

Updated August 19, 2025

Site work, paving and new construction of a civil project in South Bay, Florida. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Counties: Palm Beach Road Name: PALM BEACH SR 27 (US 27) Limits: At I-75/us 27 Interchange Project(s): 44928115201(*) Federal Aid No: D425040B Project(s): 44813615201(*) Federal Aid No: N/A Project(s): 44813615601 Federal Aid No: N/A Project(s): 44813615602 Federal Aid No: N/A Question Deadline 07/23/2025 at 5:00 PM ET Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. Contract Days: 798 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 45 Days Please read the full advertisement Description: The improvements under this Contract consist of, but are not limited to, MOT (standard), new twin-bridge structures, MSE Walls, concrete barrier walls, earthwork (regular excavation, canal excavation, dredge and fill, embankment), asphalt (base, milling, superpave, friction course), guardrails, pavement markings (raised, painted, thermoplastic), rumble strips, signing (single-post, object marker, panel), and utilities (bridge mounted conduits, barrier embedded conduits, embedded junction boxes) along State Road 25 (US-27), located 27 miles north at of the I-75/US 27 Interchange for 0.37 miles in Palm Beach County For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 016 - Intermediate Bridge Construction - SR 27 (US 27)

Award

Bridges / Tunnels

$20,985,425.00

Public - State/Provincial

New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

80 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
337
Active Projects
150
Bidding Soon
2,155
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2025

September 29, 2025

Project location map

US-27, South Bay, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.