Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 3, 2025 at 8:00 PM
Updated July 18, 2025
Demolition, site work, new construction, remodeling and addition to a municipal facility in Florence, Wisconsin. Completed plans call for the addition of a municipal facility; for the demolition of a municipal facility; for the construction of a municipal facility; for the remodel of a municipal facility; and for site work for a municipal facility.
The Boldt Company has been selected as the Construction Manager by Florence County to administer the Florence County EMS Stations Project. Bidders shall be submitting a lump sum proposal of which will be evaluated and awarded to the lowest most responsible and complete proposal The bidding phase will be divided into two separate bid periods. Bid Phase 1 consisting of earthwork, structural concrete, mechanical (design-build), and electrical (design-build). The Project consists of two (2) new EMS stations located in Aurora and Tipler/Long Lake, as well as an addition and remodel of the existing Florence EMS station. The new facilities in Aurora and Tipler/Long Lake will be approx. 4,000 SF and designed to support emergency medical services with vehicle storage staff dormitones, administrative offices and support spaces. The Project includes full architectural, structural, mechanical, electrical and plumbing systems. The addition in Florence will be approx 3500 SF and designed to support emergency medical services with vehicle storage, staff dormitories, administrative offices, and support spaces The Project includes full architectural structural mechanical, electrical, plumbing and sprinkler systems Remodel scope will be the reconfiguration of existing ambulance bays and minor interior upgrades to existing infrastructure Florence County reserves the right to reject a bid which is in any way incomplete, irregular or to waive informalities or irregularities in the bid received. Florence County also reserves the right to reject any and all bids in its best interest. All questions shall be submitted via email to Alex Steines. Project Manager.
Post-Bid
Municipal
$5,000,000.00
Public - County
Addition, Demolition, New Construction, Remodeling, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 17, 2025
November 17, 2025
To Be Determined, Florence, WI
Related To This Project
Florence, WI
Bid Date: Jul 17 2025
Florence, WI
--
Florence, WI
--
Florence, WI
--
Florence, WI
Bid Date: Aug 13 2024
Florence, WI
Bid Date: May 30 2024
Florence, WI
Bid Date: May 13 2024
Florence, WI
Bid Date: Mar 19 2024
Florence, WI
Bid Date: Mar 20 2024
Florence, WI
--
Florence, WI
Bid Date: Jun 12 2023
Florence, WI
Bid Date: Apr 12 2023
Florence, WI
Bid Date: Jun 27 2022
Florence, WI
Bid Date: Apr 12 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
