BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 24, 2025 at 8:00 PM

Updated July 25, 2025

Renovation of a playground / park / athletic field in Florissant, Missouri. Completed plans call for the renovation of a 890-square-foot playground / park / athletic field.

The City of Florissant is seeking bids to install epoxy flooring in 6 bathrooms at St. Ferdinand Park. Contractors should provide, prep, and install a Full Flake Broadcast epoxy flooring system in a total of 6 rooms, totaling 890 SF, with integrated cove base. The expansion gap along the exterior walls will be filled with a flexible material before the coves are installed. The entire system will receive an additional coat of urethane for wear and chemical resistance. Color samples should be provided to the City if selected for the project. Surface Preparation: Abrade all specified concrete surfaces using a portable industrial diamond grinding unit with an integrated dust recovery system or other abrading equipment necessary to prepare the surface to receive the subsequent coating system. Abrade all specified concrete edges using diamond grinding equipment with an integrated dust recovery system. Form a cove base with the floor system for seamless continuation up the vertical surface for four (4) inches, cove and floor system to match Clean and rout out the designated cracks and joints to an acceptable width and fill with compatible filling material to match the intended usage. Remove all damaged or loose substrate previously identified and replace with rapid strength epoxy repair mortar, polymer concrete or other compatible repair material. Contract shall run for a 5 Months period, effective July 2025-November 2025. Question Deadline 07/14/2025 at 5:00 PM CT Question Response Deadline: July 15, 2025, 5:00pm Summary General work description: The City of Florissant is seeking bids to install epoxy flooring in 6 bathrooms at St. Ferdinand Park. Contractors should provide, prep, and install a Full Flake Broadcast epoxy flooring system in a total of 6 rooms, totaling 890 SF, with integrated cove base. The expansion gap along the exterior walls will be filled with a flexible material before the coves are installed. The entire system will receive an additional coat of urethane for wear and chemical resistance. Color samples should be provided to the City if selected for the project. Surface Preparation: o Abrade all specified concrete surfaces using a portable industrial diamond grinding unit with an integrated dust recovery system or other abrading equipment necessary to prepare the surface to receive the subsequent coating system. o Abrade all specified concrete edges using diamond grinding equipment with an integrated dust recovery system. Form a cove base with the floor system for seamless continuation up the vertical surface for four (4) inches, cove and floor system to match Clean and rout out the designated cracks and joints to an acceptable width and fill with compatible filling material to match the intended usage. Remove all damaged or loose substrate previously identified and replace with rapid strength epoxy repair mortar, polymer concrete or other compatible repair material.

Award

Playgrounds / Parks / Athletic Fields

$15,808.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
248
Active Projects
150
Bidding Soon
1,289
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2025

August 18, 2025

Project location map

25 St Ferdinand Park Dr, Florissant, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.