Site work and paving for a mixed-use development in Downers Grove, Illinois. Working plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; road / highway; and water / sewer project.

As per the Owner the project has been Withdrawn. (9,753-SQ YD) Parking Improvements include: Pavement removal, placement of sub- base, HMA binder course and HMA surface course, drainage structures adjustment and cleaning, curb and gutter spot repairs, pavement markings. Location: IDOT District 1 Maintenance Yard off of US 34 (Ogden Avenue) within the City of Naperville in DuPage. Region 1 District 1 Federal Project # N/A County(s) DuPage Key Route(s) FAP 311 Marked Route(s) US 34 (OGDEN AVE) Section(s) 2018-127-RS State Job #(s) C-91-271-19 PPS #(s) N/A VBP %0.00 Contract Specifics 40 Working Days Questions not accepted as of July 22, 2025 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, July 11, 2025. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 010 - Pavement Removal, Placement of Sub- Base, HMA Binder Course and Hma Surface Course, Drainage Structures Adjustment and Cleaning, Curb and Gutter Spot Repairs, Pavement Markings This work shall consist of removing and disposing the existing fence as shown in the Plans or otherwise directed by the Engineer. This work shall consist of furnishing and installing precast concrete parking blocks at the locations noted in the plans and/ or as directed by the Resident Engineer. The blocks shall be machine made with 3,500 psi concrete and reinforced with two #3 deformed steel bars. Dowel holes shall be cast in the block to receive two #6 deformed steel bar pins, 36" in length. The pins shall be driven through the holes provided in the parking blocks into the new asphalt surface, or through drilled holes in a concrete or asphalt surface. The pins are to be 1" below the top of the parking block to hold the parking block in place. The new pins and the drilling of the holes for the pins shall not be paid for separately but shall be considered included in this pay item. This work shall consist of the removal and the disposal of the parking blocks, at the locations shown in the plans, as supplemented herein, and as directed by the Engineer. The steel pins that anchor the existing parking blocks shall be pulled out and disposed of. This work shall consist of the complete removal and disposal of existing temporary concrete barrier according to the applicable portions of Section 202 and Section 704 of the Standard Specifications and as specified herein. This item shall consist of the disconnection and removal of the temporary wood poles and aerial cable installed to provide temporary connections for the existing lighting system and all associated apparatus and connections in accordance with the Standard Specifications for Road and Bridge Construction adopted April 1, 2016, Section 841 except as specified within. This item shall consist of furnishing all labor, equipment and materials necessary for the removal and disposal of the existing sheet pile wall as specified in the plans and as directed by the Engineer. The work shall be done in accordance with the applicable portions of Section 501 of the Standard Specifications. No specific information about the existing sheet piles that may be encountered is included. Walers, bracing, anchors and other structural components tied to the sheet piling may be encountered. When allowed by the Engineer, the Contractor may elect to cut off a portion of the sheet piles leaving the remainder in place. The sheet pile shall be removed to at least 2 feet below the proposed elevation of subgrade or finished surface. The Contractor shall exercise caution not to damage elements of existing structures, pavements or other items not specifically identified for removal. Any damage to the existing elements or adjacent utilities and/or properties is the responsibility of the Contractor and Contractor shall repair any such damage to the satisfaction of the Department and at no cost to the Department.

Final Planning

Roads / Highways

$3,000,000.00

Public - State/Provincial

Paving, Site Work

13

8

15

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
452
Active Projects
243
Bidding Soon
3,322
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2025

February 2, 2026

Project location map

Ogden Ave, Downers Grove, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.