BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 2, 2025 at 8:00 PM

Updated July 3, 2025

Renovation of a municipal facility in Rochester, New Hampshire. Completed plans call for the renovation of a municipal facility.

As of July 2, 2025, this portion of the project has been awarded. As part of the Infrastructure Investment and Jobs Act (IIJA), the National Electric Vehicle Infrastructure (NEVI) Formula Program (Program) intends to make significant investments in electric vehicle (EV) charging infrastructure that will put the United States on a path to a nationwide network of 500,000 EV chargers by 2030 and ensure a convenient, reliable, affordable, and equitable charging experience for all users. New Hampshire will receive more than $17 million over the next five years to create an EV charging network throughout the State. The New Hampshire Department of Transportation's (NHDOT) vision is to strategically deploy an interconnected and equitable network of public electric vehicle charging infrastructure to encourage electric vehicle travel, maintain economic competitiveness, and stimulate public-private sector collaboration in the State of New Hampshire. NHDOT expects to award as many grants as possible with the available funding for Round 1 with no minimum or maximum award size per site. The State reserves the right to cancel or extend the RFP process at any time. The State also reserves the right to reject any and all submissions in response to this RFP and to waive formalities if doing so is in the best interest of the State of New Hampshire. NHDOT is not obligated to award all these funds to Phase 1 projects. Pre-bid Questions Due- No Later Than October 30, 2023 4:00 PM Responses to RFP Release Questions Posted November 6, 2023 Anticipated Award Date January 26, 2024 Anticipated Contract Award Date April 26, 202 Contract Term The Contract term shall be from the effective date of the Contract until 5 years from the notice of acceptance date of the last (if award is for multiple stations) charging station installed under the Contract. A Notice of Acceptance will be issued by NHDOT following the successful installation, testing, and certification of the site, as approved by NHDOT. The Operations and Maintenance (O&M) Period will start on the date of the Notice of Acceptance and continue for 60 months following this date. All funds (except the withholding) will be disbursed once a final invoice is approved for payment after Notice of Acceptance. The site will be turned over to the Proposer five years after the Notice of Acceptance, following a two year design and construction period. The method of Contractor Selection has not been Determined at this time.

Award

Municipal

$100,000.00

Public - State/Provincial

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
377
Active Projects
181
Bidding Soon
2,921
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2025

Project location map

127 Market Pl Blvd, Rochester, NH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.