Published August 7, 2025 at 8:00 PM

Updated August 8, 2025

Site work and paving for a mixed-use development in Roselle, Illinois. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

2025 Storm Sewer Improvements Program The Village of Roselle is accepting proposals for the 2025 Storm Sewer Improvements Program located at various locations throughout the Village. These improvements shall consist of the removing and replacing existing storm sewers, shaping and grading ditches, removing and replacing driveway culverts, installing storm structures, asphalt driveway removal and replacement, concrete driveway, sidewalk and curb removal and replacement, restoration and any ancillary work necessary. Prospective bidders must provide the latest copy of their IDOT Certificate of Eligibility or the Work History Statement (which can be found in the back of the bid documents) to the Village via e-mail to engineering@roselle.il.us. The individual responsible for administering this bid is Matthew Rasmussen. Questions or requests for additional information should be directed to him via e-mail at engineering@roselle.il.us or by phone at 630-671-2366. The undersigned agrees to complete the work within 60 calendar days from Notice to Proceed. 1 Removal and Disposal of Unsuitable Material Cu-Yd 2 2 Seeding, Class 2A, Salt Tolerant Sq-Yd 2,457 3 Grading and Shaping Ditches Foot 2,110 4 Grading and Shaping Parkways Sq-Yd 281 5 Erosion Control Blanket Sq-Yd 2,457 6 3 Inch Lined Stone Ditch Foot 277 7 Sidewalk Removal Sq-Ft 675 8 Combination Curb and Gutter Removal Foot 89 9 Driveway Pavement Removal Sq-Yd 257 10 Portland Cement Concrete Sidewalk, 5 Inch Sq-Ft 825 11 Detectable Warnings Sq-Ft 40 12 Combination Concrete Curb and Gutter, M4.12 Foot 32 13 Combination Concrete Curb and Gutter, B6.12 Foot 139 14 Portland Cement Concrete Driveway, 6 Inch Sq-Yd 149 15 Portland Cement Concrete Flume Sq-Ft 45 16 Storm Sewer Removal 12" Foot 58 17 Storm Sewer Removal 15" Foot 30 18 Storm Structure Removal Each 3 19 Storm Sewer, PVC SDR 26, 10" Foot 8 20 Storm Sewer, PVC SDR 26, 12" Foot 61 21 Storm Sewer, PVC SDR 26, 15" Foot 30 22 Remove and Replace Driveway Culvert, 12" Foot 336 23 Parkway Culvert, PVC SDR 26, 12" Foot 50 24 Inlet, Type A, Type 8 Grate Each 1 25 Inlet, Type A, Type 1 Frame, Open Lid Each 1 26 Inlet, Type A, Type 11 Frame and Grate 27 Catch Basin, Type A, 4'-Dia, Type 8 Grate Each 1 28 Catch Basin, Type A, 4'-Dia, 3501P Frame and Grate Each 1 29 Class D Patches, 6" Sq-Yd 66 30 Hot-Mix Asphalt Driveway 3" Sq-Yd 90 31 Connect to Existing Structure Each 2 32 Aggregate Shoulders 12", CA-6, 4" Depth Foot 381 33 Relocate 36" Flared End Section LSum 1 34 Allowance - Items Ordered By The Engineer Unit 15,000

Award

Water / Sewer

$300,000.00

Public - City

Paving, Site Work

20

3

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
491
Active Projects
266
Bidding Soon
3,593
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2025

August 15, 2025

Project location map

Multiple Locations, Roselle, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.