BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2026 at 8:00 PM

Updated May 15, 2026

Site work for a water / sewer project in Lincoln City, Oregon. Completed plans call for site work for a water / sewer project.

Lee Reservoir to Port Water Line The General Nature of Work, Described in Detail in This Contract and in the Basis of Payment, Includes Furnishing All Labor, Equipment, and Materials Necessary for the Construction of the Project. Primary Items of Work Include: Constructing 980 Feet of 12-inch Pvc, Associated Connections, and Other Miscellaneous Items. All Written Questions Must Be Received by the City Engineer by 5 Pm Pst on April 7, 2026, 9 Calendar Days Prior to the Bid Due Date. The Project Engineer Will Determine Appropriate Responses, if Any, and if Necessary an Addendum Will Be Issued to All Plan Holders of Record at Least 5 Calendar Days Prior to the Bid Due Date. City May Cancel This Procurement or Reject Any Bid That Does Not Comply With All Prescribed Public Bidding Procedures and Requirements, Including the Requirement to Demonstrate the Bidder's Responsibility Under Ors 279c.375 (3)(B) and That City May Reject for Good Cause All Bids After Finding That Doing So is in the Public Interest. . Each Bid Proposal Must Be Submitted on the Forms Prescribed by the City and Accompanied by a Proposal Guaranty (Certified Check, Cashier's Check, or Bid Bond) in an Amount Equal to Ten (10) Percent of the Total Amount Bid. The Ten Percent Proposal Guaranty Shall Be Forfeited to the City if the Bidder Fails to Enter Into a Contract With the City of Lincoln City Within Fifteen (15) Days After the Date of the Notice of Award. The Successful Bidder Will Be Required to Furnish a Bond Equal to One Hundred Percent of the Amount Bid for Faithful Performance of the Contract. The purpose of the Contract is to set forth the rights and obligations of the parties and the terms and conditions governing completion of the Work. The Contractor's obligation shall include without limitation the following: o The Contractor shall furnish all Materials, Equipment, labor, transportation, and Incidentals required to complete the Work according to Plans, Specification, and terms of the Contract. o The Contractor shall perform the Work according to the lines, grades, Cross Section Data, typical sections, dimensions, and other details shown on the Plans, as modified by written order, or as directed by the City. o The Contractor shall perform all Work determined by the City to be necessary to complete the Project. o The Contractor shall contact the City or its representative for any necessary clarification or interpretation of the Contract.

Bid Results

Water / Sewer

$145,391.00

Public - City

Site Work

8

6

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2026

May 18, 2026

Project location map

Multiple Locations, Lincoln City, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.