Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 10, 2025 at 8:00 PM
Updated July 11, 2025
Site work and paving for a mixed-use development in Springville, Utah. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Questions Due Date: Jul 11th 2025, 12:00 PM MDT - submitted online using the "Public Q&A" section via Bonfire The Springville 400 East Improvements Project involves upgrades to pedestrian access, drainage, and roadway infrastructure. Work includes installing an ADA-compliant ramp, removing fencing and pavement for new curb and gutter, closing an existing driveway, and constructing a new driveway approach per City standards. Storm drain sumps will be added, asphalt will be patched where disturbed, and a water line may be lopped if needed. The project will also require coordination with private utility companies for any necessary relocations. The work to be performed under this project shall consist of furnishing all labor, materials, and equipment necessary or required to complete the work in all respects as shown on the plans and as herein specified. All work, materials, and services not expressly shown or called for in the Contract Documents which may be necessary to complete the construction of the work in good faith shall be performed, furnished, and installed by CONTRACTOR asthough originally so specified orshown, at no increase in cost to OWNER These CONTRACT DOCUMENTS will include an agreement to be signed by both the CONTRACTOR and the OWNER prior to any work commencing. A PAYMENT BOND and PERFORMANCE BOND will be required by the winning CONTRACTOR and all necessary forms are also included in the CONTRACT DOCUMENTS. All communication relative to the Project and any questions which BIDDERs may have concerning the project shall be directed to the OWNER during the pre-bid meeting. The OWNER reserves the right to reject any or all bids; or to accept or reject the whole or any part of any bid; or to waive any informality or technicality in any bid in the best interest of the City. Only bids giving a firm quotation properly submitted and signed will be accepted. The Work will be substantially completed by Monday, September 1, 2025 ; Final completion- Monday, September 15, 2025
Final Planning
Roads / Highways
$700,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 15, 2025
January 10, 2026
400 E, Springville, UT
Related To This Project
Springville, UT
Bid Date: Aug 07 2025
Springville, UT
Bid Date: Jul 30 2025
Springville, UT
--
Springville, UT
--
Springville, UT
Bid Date: Nov 14 2025
Springville, UT
--
Springville, UT
--
Springville, UT
Bid Date: Mar 25 2021
Springville, UT
Bid Date: Jun 20 2025
Springville, UT
Bid Date: May 29 2025
Springville, UT
Bid Date: May 14 2025
Springville, UT
Bid Date: May 07 2025
Springville, UT
Bid Date: Apr 02 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
