Published July 10, 2025 at 8:00 PM

Updated July 11, 2025

Site work and paving for a mixed-use development in Springville, Utah. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Questions Due Date: Jul 11th 2025, 12:00 PM MDT - submitted online using the "Public Q&A" section via Bonfire The Springville 400 East Improvements Project involves upgrades to pedestrian access, drainage, and roadway infrastructure. Work includes installing an ADA-compliant ramp, removing fencing and pavement for new curb and gutter, closing an existing driveway, and constructing a new driveway approach per City standards. Storm drain sumps will be added, asphalt will be patched where disturbed, and a water line may be lopped if needed. The project will also require coordination with private utility companies for any necessary relocations. The work to be performed under this project shall consist of furnishing all labor, materials, and equipment necessary or required to complete the work in all respects as shown on the plans and as herein specified. All work, materials, and services not expressly shown or called for in the Contract Documents which may be necessary to complete the construction of the work in good faith shall be performed, furnished, and installed by CONTRACTOR asthough originally so specified orshown, at no increase in cost to OWNER These CONTRACT DOCUMENTS will include an agreement to be signed by both the CONTRACTOR and the OWNER prior to any work commencing. A PAYMENT BOND and PERFORMANCE BOND will be required by the winning CONTRACTOR and all necessary forms are also included in the CONTRACT DOCUMENTS. All communication relative to the Project and any questions which BIDDERs may have concerning the project shall be directed to the OWNER during the pre-bid meeting. The OWNER reserves the right to reject any or all bids; or to accept or reject the whole or any part of any bid; or to waive any informality or technicality in any bid in the best interest of the City. Only bids giving a firm quotation properly submitted and signed will be accepted. The Work will be substantially completed by Monday, September 1, 2025 ; Final completion- Monday, September 15, 2025

Final Planning

Roads / Highways

$700,000.00

Public - City

Paving, Site Work

8

20

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
54
Bidding Soon
957
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2025

January 10, 2026

Project location map

400 E, Springville, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.