BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 30, 2025 at 8:00 PM

Updated July 31, 2025

Demolition, site work, paving and new construction of a mixed-use development in Eugene, Oregon. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Update: This project will rehabilitate Delta Highway from Ayres Road to Green Acres Road. The work will include evaluation of the existing roadway structure and may include a variety of rehabilitation or reconstruction techniques. Sidewalk access ramps will be upgraded within the project limits. This project will also include improvements to the existing sidewalk on the east side of the roadway utilizing grant funds from the Oregon Community Paths Program. The full scope of the project has yet to be determined and will be further refined during project plan development. This project may be delivered in combination with the Ayres Pond Culvert Replacement and/or the North Delta Highway Stormwater Facility Rehabilitation project. Project is included City of Eugene Fiscal Year 2025-2031 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- This project will rehabilitate Delta Highway from Ayres Road to Green Acres Road. The work will include evaluation of the existing roadway structure and may include a variety of rehabilitation or reconstruction techniques. Sidewalk access ramps will be upgraded within the project limits. This project will also include improvements to the existing sidewalk on the east side of the roadway utilizing grant funds from the Oregon Community Paths Program. The full scope of the project has yet to be determined and will be further refined during project plan development. This project may be delivered in combination with the Ayres Pond Culvert Replacement and/or the North Delta Highway Stormwater Facility Rehabilitation project. The project is included in the City's 2026-2031 Capital Improvement Program (CIP). As of July 9, 2025, per owner, this is a future project that is still in pre-scoping or design. Nothing will be moving before the first of 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$3,120,000.00

Public - City

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
4
Bidding Soon
315
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.