BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 17, 2025 at 8:00 PM

Updated September 18, 2025

Site work and renovation of a mixed-use development in Fulton, New York. Completed plans call for the renovation of a educational facility; and for site work for a educational facility.

Contractors should refer to the 2008 Wicks Reform and New York State Labor Law Section 220-i for additional bid submission procedures and requirements not otherwise outlined in the contract documents. Document info : Contract Documents may be downloaded from the Plan and Print Systems, Inc. website for a nonrefundable cost of $49.00. Electronic Contract Documents on a flash drive may also be obtained from Plan & Print (Telephone: 315.437.5111, Fax: 315.463.1510) upon payment of a non-refundable $49.00 plus shipping and handling per flash drive. Contact Plan & Print for shipping and handling costs. Checks shall be made payable to Plan & Print Systems, Inc. Contract documents will be delivered via UPS Ground service upon request and receipt of an additional non-refundable delivery and handling charge, payable by separate check to Plan & Print Systems, Inc. Contact Plan & Print for shipping and handling costs. Any sets required in excess of the above-mentioned maximums are to be obtained directly by interested parties at the full cost of printing, at their cost, directly from Plan and Print Systems. Only complete sets will be issued. At the time the order is placed, plan holder shall advise Plan and Print Systems of status as to prime bidder, subcontractor, or material supplier and to trade affiliation. Postal address, telephone number, fax number, and email will also be required. For Contract Documents which are not returned to the printer within this 30-day period, deposits will NOT be refunded. The Owner reserves the right to waive any informality in or to reject any or all Bids. Requests for interpretation, information or clarification (RFI) of the Contract Documents must be made in writing. Responses to RFIs will not be made over the telephone. Responses to RFIs will be advisory only and will not modify the Contract Documents. The Contract Documents stand as published except as modified by written Addenda before bid and Modifications after execution of the Agreement. RFIs may be emailed simultaneously to both: Mr. Michael James King + King Architects LLP 358 W. Jefferson Street Syracuse, New York 13202 Mr. Matthew Herbert LeChase Construction 609 Erie Boulevard West Syracuse, New York 13204 (315) 418-6400 or e-mailed to Mr. James' attention at mjames@kingarch.com AND e-mailed to Mr. Matthew Herbert's attention at matthew.herbert@lechase.com Deadline for RFI's is Tuesday, July 29, 2025. Each Bidder must deposit with its Bid, security in an amount and form subject to the conditions provided in the Contract Documents. Withdrawal of Bids will be subject to the conditions provided in the Instructions to Bidders.

Award

Educational

$1,629,000.00

Public - City

Renovation, Site Work

82

27

15

8

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
3
Bidding Soon
948
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2025

September 4, 2025

Project location map

167 S 4th St, Fulton, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.