Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 29, 2025 at 8:00 PM
Updated July 30, 2025
Site work and renovation of a water / sewer project in Cusick, Washington. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Big Sky ID Corp is soliciting qualified and certified UDBE/MBE/WBE subcontractor and material bids for the above referenced project. The project is located in Cusick, WA. The Project includes the following Work: Mobilization and administration Demolition of piping and appurtenances Interim fix to Filter Train 1 o Replace/Update three turbidity meter sample pumps, piping, and/or location of samplers on Filter Train 1 Rehabilitation of Filter Train 2 including: o Disassembly/Demolition of tank internals and external piping connections o Remove and dispose of existing filter media o Sand blast tank interior to white bare metal o Repair areas of structural damage and corrosion o Fully repaint tank interior o Touch up paint tank exterior o Install cast in place concrete floors for underdrain flume structure in tank o Install new weir plates and connecting hardware o Install new clarifier influent distributor assembly, joint material, and connecting hardware o Install new air scour assembly o Install new filter underdrains o Install new lower media retaining screens, gaskets, and connecting hardware o Install new clarifier filter media o Install new upper retaining screen assemblies o Install new manway cover gasket o Reconnect external piping, valves and appurtenances to the tank Install a redundant backwash pump and associated piping and appurtenances Install new inline static mixer on plant influent piping Replace treatment plant control valve pneumatic actuators with electric actuators Valve Vault Piping o Repair leak in valve vault piping downstream of distribution pumps o Install an 8-inch by 4-inch tee, with resilient seat gate valve, tapped blind flange and 2.5- inch male NTP by male NH/NST adapter fitting o Install a 4-inch manual bypass around distribution pumps for filling clearwell For additional information regarding this project, contact Kevin Taft, Civil Engineer at Varela Engineering & Management at (509) 328-6066 or ktaft@varela-engr.com
Bid Results
Water / Sewer
$1,019,919.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 28, 2025
August 27, 2025
To Be Determined, Cusick, WA
Related To This Project
Cusick, WA
Bid Date: Jul 31 2025
Cusick, WA
Bid Date: Jan 15 2026
Cusick, WA
Bid Date: Mar 31 2025
Cusick, WA
Bid Date: Mar 20 2025
Cusick, WA
Bid Date: May 08 2024
Cusick, WA
Bid Date: Dec 04 2023
Cusick, WA
Bid Date: Feb 22 2022
Cusick, WA
Bid Date: Jul 11 2023
Cusick, WA
Bid Date: Jun 29 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
