BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 22, 2025 at 8:00 PM

Updated October 30, 2025

Site work for a water / sewer project in Encinitas, California. Working plans call for site work for a water / sewer project.

**As of August 22, 2025 the City will be rejecting all bids and re-evaluating project scope. We anticipate re-bidding the project at a later date. License Requirements Class A Liquidated Damages $3,600 Question Deadline 07/22/2025 at 12:00 PM PT Online Q&A Yes, All questions regarding this project shall be submitted through online. The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The work is described as the removal of existing and replacing storm drain infrastructure, installation of cleanout structures, and road work, north of the intersection of El Camino Real and Via Molena. The work to be done generally includes: The demolition and removal of an existing 140' long, 36"x24" concrete encased elliptical corrugated metal pipe and an existing 22' long, 18" reinforced concrete pipe that crosses El Camino Real, north of the Via Molena intersection. After removal, the pipes will be replaced with a 30" and 18" reinforced concrete pipes, respectively, and contain cleanout structures at the junctions. The restoration of road surface along the proposed alignment will include replacement of asphalt concrete, concrete sidewalk, concrete spandrel, concrete median, curb and gutter, median curbs, and existing landscaping. Road striping and traffic loops will be replaced in kind.

Final Planning

Water / Sewer

$413,998.00

Public - City

Site Work

5

10

2

5

Subscribe For Documents

89 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
563
Active Projects
140
Bidding Soon
3,487
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2025

February 23, 2026

Project location map

Via Molena & N El Camino Real, Encinitas, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.