Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 22, 2025 at 8:00 PM
Updated October 30, 2025
Site work for a water / sewer project in Encinitas, California. Working plans call for site work for a water / sewer project.
**As of August 22, 2025 the City will be rejecting all bids and re-evaluating project scope. We anticipate re-bidding the project at a later date. License Requirements Class A Liquidated Damages $3,600 Question Deadline 07/22/2025 at 12:00 PM PT Online Q&A Yes, All questions regarding this project shall be submitted through online. The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The work is described as the removal of existing and replacing storm drain infrastructure, installation of cleanout structures, and road work, north of the intersection of El Camino Real and Via Molena. The work to be done generally includes: The demolition and removal of an existing 140' long, 36"x24" concrete encased elliptical corrugated metal pipe and an existing 22' long, 18" reinforced concrete pipe that crosses El Camino Real, north of the Via Molena intersection. After removal, the pipes will be replaced with a 30" and 18" reinforced concrete pipes, respectively, and contain cleanout structures at the junctions. The restoration of road surface along the proposed alignment will include replacement of asphalt concrete, concrete sidewalk, concrete spandrel, concrete median, curb and gutter, median curbs, and existing landscaping. Road striping and traffic loops will be replaced in kind.
Final Planning
Water / Sewer
$413,998.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 29, 2025
February 23, 2026
Via Molena & N El Camino Real, Encinitas, CA
Related To This Project
Encinitas, CA
--
Encinitas, CA
Bid Date: Aug 08 2025
Encinitas, CA
Bid Date: Aug 15 2025
Encinitas, CA
--
Encinitas, CA
--
Encinitas, CA
--
Encinitas, CA
Bid Date: Oct 14 2025
Encinitas, CA
Bid Date: Jul 24 2025
Encinitas, CA
Bid Date: Jul 15 2025
Encinitas, CA
--
Encinitas, CA
Bid Date: Jul 01 2025
Encinitas, CA
--
Encinitas, CA
Bid Date: Jun 27 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
