Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 30, 2025 at 8:00 PM
Updated July 31, 2025
This is a service / maintenance or supply contract in Petersburg, Alaska. Contact the soliciting agency for additional information.
Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. A pre-solicitation site visit was conducted on July 23rd, 2025 to view the project area and discuss the objectives of this contract. Please contact for further information on visiting the project area. Please contact Rachel Shaw (Rachel.A.Shaw@usda.gov) or Ben Case (Benjamin.Case@usda.gov) at the Petersburg Ranger District office, (907)-772-3871 for directions to the site. PERIOD OF PERFORMANCE IS FROM DATE OF AWARD THROUGH October 31, 2030 Project Location - T56S, R79E, Sec.35, T57S, R80E, Sec 4, 5, 8, 9, 10, 11, 13, 14, 15, 16, 17, 18, 19, 20, 23, 24 Copper River Meridian in the Petersburg Ranger District of the Tongass National Forest Description of Work - The objectives of this project are to increase the viability of young-growth harvest for the benefit of local economies, provide early seral habitat for the area's deer and moose populations, improve water quality, riparian and wildlife habitat, improve ecological function and maintain water quality by accomplishing the following: Mobilize ground-based logging equipment by barge to the Contract Area. Create openings through timber harvest in densely stocked young-growth stands. Remove included saw timber to landings to be loaded and hauled by truck to a log transfer facility. Transport logs from log transfer facility to a mill or export point. In-water log storage (rafting) requires the operator to obtain a permit from the Alaska Department of Environmental Conservation (ADEC). Mobilize road work equipment by barge to Contract Area. Perform road maintenance, including surface rock replacement on haul roads. Reconstruction of temporary road on decommissioned road prisms to access harvest areas. Road improvements, including cleanout of culvert catch basin, installation of beaver deceiver analog, regrading, resurfacing, reconditioning, installation of poly pipes, placement of riprap and the removal of trees from road prism. Hand thin densely stocked stands of Sitka spruce and western hemlock to improve riparian and wildlife habitat. Remove up to five (5) derelict vehicles along road and parking areas from the Contract Area. Perform road improvement by resurfacing. There is an estimated volume of 4,059.65 MBF of Sitka spruce and 462.26 MBF of western hemlock sawtimber of included timber. Awarded contract will be a commercial services contract with requirements for timber removal. The contract shall be awarded using a best value source selection method; the resulting contract shall be a firm fixed price commercial services contract. Follow this notice on SAM for future notifications by clicking the "Follow" button above. The Method of Contractor Selection has not been determined at this Time.
Final Planning
Roads / Highways
Public - Federal
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 22, 2025
Multiple Locations, Petersburg, AK
Related To This Project
Petersburg, AK
Bid Date: Sep 25 2025
Petersburg, AK
Bid Date: Oct 16 2025
Petersburg, AK
Bid Date: Oct 09 2025
Petersburg, AK
Bid Date: Sep 26 2025
Petersburg, AK
Bid Date: Nov 07 2025
Petersburg, AK
Bid Date: Jun 20 2025
Petersburg, AK
Bid Date: Jun 11 2025
Petersburg, AK
Bid Date: May 14 2025
Petersburg, AK
Bid Date: Mar 05 2025
Petersburg, AK
Bid Date: Feb 07 2025
Petersburg, AK
Bid Date: Jan 10 2025
Petersburg, AK
--
Petersburg, AK
Bid Date: Aug 20 2024
Petersburg, AK
Bid Date: Aug 20 2024
Petersburg, AK
Bid Date: Aug 22 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
