BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 31, 2025 at 8:00 PM

Updated August 1, 2025

Site work for a water / sewer project in Pueblo, Colorado. Working plans call for site work for a water / sewer project.

PRESOLICITATION - EXTENDED Lake George & Monument Fire Center Sewer Line Replacement Pike-San Isabel National Forests & Cimarron and Comanche National Grasslands South Park & Pikes Peak Ranger Districts 1. Introduction. This pre-solicitation notice is for information only and is not a commitment by the Government to solicit contractual offers or award contracts. The Government is not soliciting, nor will it accept proposals as a result of this presolicitation. If a competitive solicitation is issued in the future, it will be announced via The System for Award Management (SAM) at SAM.gov and interested parties must comply with that announcement. The Government will not reimburse respondents for any questions submitted or information provided as a result of this notice. This is not a solicitation or a promise to issue a solicitation, and this information is subject to modification and in no way binds the Government to award a contract. 2. Applicable North American Industry Classification System (NAICS) Code. The applicable NAICS CODE: 237110 - Water and Line and Related Structures Construction (Size Standard in millions of dollars $45M). 3. Type of Contract to be Awarded. As a result of this presolicitation and possible solicitation, the Contract Service Area (CSA) Intermountain 8 plans to award a firm fixed price contract. 4. Type of Solicitation. The solicitation, if released, will be governed by Federal Acquisition Regulation Part 15, "Contracting by Negotiation". 5. Presolicitation Posting Period. This presolicitation will be posted for 16 days. 6. Contracting Office Points of Contact. Holly Hlavac, Contract Specialist, Holly.Hlavac@usda.gov 7. Contract Background and Description. The existing sewer systems at both sites are of considerable age, nearing the end of useful service life, and have been incurring increased maintenance costs to address clogging and freezing issues. The existing sewer line at Lake George is made of clay pipe and the joints have become offset overtime allowing for root penetration into the sewer line. This results in clogging issues that must be regularly cleaned. The new sewer line will resolve this issue. The existing sewer line at Monument is too shallow and generally freezes over the winter, which renders the bathroom facilities in the Classroom building unusable. The new sewer line installed at a greater depth will resolve this issue. These sites are open and accessible year-round by highway legal vehicles. Approximate site elevations are approximately 7,100 feet at Monument and 8,100 feet at Lake George. Winter conditions (freezing temperatures, snow fall, frozen ground, etc.) can be anticipated approximately October through April. Cellular phone service is generally available at both sites. Scope of Work - The project scope of work generally consists of the following: Lake George Work Center Installation of new sanitary sewer service lines from the Brown House and Office buildings to the existing septic tank. Associated and ancillary work includes mobilization, quality control, project management and coordination, utility abandonment/demolition, site demolition, excavation, trenching, backfill, and site surface restoration. Refer to the Project Manual/Specification and Construction Drawings for a full depiction of the work. Monument Fire Center Installation of new sanitary sewer service lines from the Classroom building to an existing sewer manhole. Removal and replacement of existing site water hydrants. Associated and ancillary work includes mobilization, quality control, project management and coordination, utility abandonment/demolition, site demolition, excavation, trenching, backfill, and site surface restoration. Refer to the Project Manual/Specification and Construction Drawings for a full depiction of the work. 8. Project Location. This project consists of work at two Forest Service administrative sites on the Pike-San Isabel National Forests & Cimarron and Comanche National Grasslands: Lake George Work Center South Park Ranger District 140 Trail Creek Road Lake George, CO 80827 Monument Fire Center Pikes Peak Ranger District 3751 Mt. Herman Road Monument, CO 80132 These sites are open and accessible year-round by highway legal vehicles. Winter conditions (freezing temperatures, snow fall, frozen ground, etc.) can be anticipated approximately October through April. 9. Estimated Period of Performance. September 22, 2025, through November 21, 2026 10. Site Visit. A site visit is anticipated; details will be provided at time of Solicitation. 11. Disclosure of Magnitude. The anticipated magnitude for this project is between $25,000 and $100,000. 12. Type of Set-aside. Total small business set-aside. 13. Responses. Interested and capable sources are encouraged to respond to this presolicitation with a Statement of Capability. In addition to a Statement of Capabilities, firms responding to this announcement should include Company Name, Unique Entity Identification, Point of Contact, Address, and indicate whether they are a Small Business, 8(a) Concern, Veteran-Owned Small Business, Service-Disabled Veteran-Owned Business, HUBZone Small Business, Small Disadvantaged Business, or Women-Owned Small Business. Responses are due within 18 days of this presolicitation and should be submitted to Contracting Specialist, Holly Hlavac at Holly.Hlavac@usda.gov. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Water / Sewer

$100,000.00

Public - Federal

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
45
Bidding Soon
293
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2025

September 22, 2025

Project location map

To Be Determined, Pueblo, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.