BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 16, 2025 at 8:00 PM

Updated August 17, 2025

Site work and paving for a mixed-use development in Centennial, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reference Number 0000392398 Bid Intent Not Available The Work generally consists of 5,000 linear feet of concrete and asphalt trail connecting the High Plains Trail off E470 between South Ireland Way and Parker Road to the Existing Segment One Connection. Included in the project will be clearing & grubbing, removals, unclassified excavation & earthwork, erosion control measures, drainage pipe, inlets, & drains, signage & pavement markings, and construction facilities. Each bid shall be made on the Form of Bid provided in the Contract Documents, and no Bidder may withdraw his/her bid for a period of ninety (90) calendar days from the Notice To Proceed (NTP). Question Deadline 08/04/2025 at 12:00 PM MT Questions are submitted online Yes Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Labor and Materials Bond 100 % Arapahoe County reserves the right to reject any and all or part of all Bids, to waive any informalities or irregularities therein.

Bid Results

Sidewalks / Parking Lot

$999,072.00

Public - County

Paving, Site Work

126

6

4

8

Subscribe For Documents

101 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
326
Active Projects
177
Bidding Soon
1,268
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2025

September 15, 2025

Project location map

S Parker Rd, Centennial, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.