BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 11, 2025 at 8:00 PM

Updated July 12, 2025

This is a service / maintenance or supply contract in Livermore, Colorado. Contact the soliciting agency for additional information.

Reference Number 0000390031 Purchase Type: Term: 09/01/2025 02:00 AM EDT - 08/31/2026 02:00 AM EDT Option: 4 Additional 1 Year Renewals The City of Fort Collins (City) is seeking proposals from qualified Contractors (Contractor)for the design and manufacturing of an approximately 57 kW turbine-generator package (hydroelectric package) located at the Halligan Dam near Livermore, CO. This RFP is part of the larger Halligan Water Supply Project (HWSP) that includes the design and construction of a replacement Halligan Dam to provide additional municipal raw water storage for Fort Collins Utilities. The hydroelectric turbine will be part of the replacement Halligan Dam outlet works and provide power for operating the facility. Requested services include design coordination with the Halligan design engineer and City, manufacturing and delivery of the micro hydroelectric turbine, generator, and ancillary components, installation oversight, testing and commissioning for all components required to safely operate the package. It is expected that a separate general contractor contracted by the City will install the equipment at the replacement dam outlet works. A pre-proposal meeting will be held at time. The pre-proposal meeting will be hosted online via Microsoft Teams. Copy and paste or click the link below for access to the meeting. Please enter your name, company name, and email address into the chat as this is what will be used to create the attendance record Question Deadline 07/23/2025 at 3:00 PM MT Questions are submitted online No, All questions should be submitted, in writing via email, to Jake Rector, Senior Buyer at jrector@fcgov.com, Questions received after this deadline may not be answered. Responses to all questions submitted before the deadline will be addressed in an addendum and posted on the online. Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required - Warranty Information Required Award Requirements - All or None Award The City reserves the right to reject any and all proposals and to waive any irregularities or informalities

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
1
Bidding Soon
478
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2025

Project location map

Multiple Locations, Livermore, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.