Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 28, 2025 at 8:00 PM
Updated August 29, 2025
Site work and paving for a mixed-use development in Bridgewater, New Jersey. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
**As of August 28th, 2025, the project was awarded to Top Line Construction Corp, with an awarded amount of $1,908,283.71.** https://www.bridgewaternj.gov/wp-content/uploads/2025/04/4-24-2025-Agenda.pdf PROJECT RESOLUTION FOR PROFESSIONAL SURVEYING AND ENGINEERING SERVICES (PHASE 1) FOR THE 2025-4 ROADWAY IMPROVEMENT PROJECT WHICH INCLUDES ENTIRE LENGTHS OF SUNSET DRIVE, MEINERS DRIVE, RUSSET LANE, PEACHTREE ROAD, RICKY DRIVE, ROBIN WAY, BLUESTONE LANE, CARNOUSTIE DRIVE, TURNBERRY COURT, AND PARTIAL LENGTHS OF CLAIRE DRIVE (ARTHUR ROAD TO ROBIN WAY), GLENWOOD TERRACE (FOOTHILL ROAD TO CLAIRE DRIVE) AND PAPEN ROAD (WEST FROM ROGER LANE) TO REMINGTON & VERNICK ENGINEERS, 429 ROUTE 79, SUITE 21, MORGANVILLE, NJ 07751, IN THE AMOUNT OF $140,680.00, FUNDED THROUGH THE 2024 CAPITAL ROAD IMPROVEMENT BOND --------------------------------------------------------------------------------------------------- Project description: provide construction services which will consist of improvements to the entire lengths of sunset drive, meiners drive, russet lane, peachtree road, ricky drive, robin way, bluestone lane, carnoustie drive, turnberry court, and partial lengths of claire drive, glenwood terrace and papen road including but not limited to milling and resurfacing of the roadway, upgrades and repairs to stormwater infrastructure, new handicap ramps, areas of sidewalk and curb replacement, and select driveway apron repairs. The total project length is approximately 9,395 linear feet. All disturbed areas will be restored to their original condition The bids for this project have been broken out into base and alternate bids. The base bid includes all improvements to the entire lengths of sunset drive and meiners drive, whereas alternate bid "a" includes improvements to the partial lengths of claire drive, glenwood terrace and robin way, alternate bid "b" includes improvements to the entire lengths of russet lane, peachtree road, ricky drive and the partial length of papen road and alternate bid "c" includes improvements to the entire lengths of bluestone lane, carnoustie drive and turnberry court. Bridgewater township will evaluate the successful bid and determine whether to award the construction services for the base and alternate bids, for the base bid alone or for any combination of base and alternate bid(s). *Bid addenda will be issued on the website. Therefore, it is the sole responsibility of the bidder to check the website from now through the bid opening. All bid results will be posted on the township website Bidders are subject to the provisions of the new jersey local public contracts law, n.J.S.A.40a:11 - 1 seq. Governing bidding requirements. Bidders are required to comply with the requirement of n.J.S.A. 10:5-31 at seq and p.L. 1975 c. 127 (n.J.A.C. 17:27) affirmative action. By order of: sarah l. Housman qualified purchasing agent township of bridgewater 100 commons way bridgewater, new jersey 08807 Question Deadline 07/17/2025 Request shall be in writing, addressed to the Township's representative stipulated in the specification. In order to be given consideration, a written request must be received at least three (3) business days prior to the date fixed for the opening of the bid for goods and services.
Award
Roads / Highways
$1,908,284.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 22, 2025
August 21, 2025
Multiple Locations, Bridgewater, NJ
Related To This Project
Bridgewater, NJ
Bid Date: Jul 22 2025
Bridgewater, NJ
Bid Date: Jul 22 2025
Bridgewater, NJ
Bid Date: Aug 26 2025
Bridgewater, NJ
Bid Date: Oct 01 2025
Bridgewater, NJ
Bid Date: Sep 10 2025
Bridgewater, NJ
Bid Date: Oct 02 2025
Bridgewater, NJ
Bid Date: Oct 15 2025
Bridgewater, NJ
Bid Date: Oct 17 2025
Bridgewater, NJ
Bid Date: Jul 16 2025
Bridgewater, NJ
Bid Date: Jul 16 2025
Bridgewater, NJ
Bid Date: Jul 16 2025
Bridgewater, NJ
Bid Date: Jul 16 2025
Bridgewater, NJ
Bid Date: Jul 16 2025
Bridgewater, NJ
Bid Date: Jun 25 2025
Bridgewater, NJ
Bid Date: May 29 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
