Site work for a water / sewer project in Honea Path, South Carolina. Completed plans call for site work for a water / sewer project.
The Town of Honea Path (Owner) is requesting Bids for the Chiquola and Clatworthy Subbasin Sewer Rehab Phase 1 (Division A) project which includes furnishing all materials, equipment, and labor necessary to construct the following summary of Work and approximate quantities: Pipe bursting 579 Linear Feet (LF) of 8" HDPE and 466 LF of 10" HDPE sewer lines. Cured In Place Pipe of 421 LF 8" Dia. Reconnection of 19 lateral connections, Structural manhole rehabilitation of 4 manholes totaling 27 vertical feet of lining, miscellaneous point repairs and all restoration. The bid is divided into a Base Bid with three (3) add alternates. Prospective Bidders may obtain copies of the Bidding Documents from the Issuing Office as described below. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office. There is no pre-bid conference for this project. A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of Bidder's maximum Bid price (determined by adding the base bid and all alternates). Site Visit and Testing by Bidders A. Bidder is encouraged to visit the Site and conduct a thorough visual examination of the Site and adjacent areas. During the visit the Bidder must not disturb any ongoing operations at the Site. Question Deadline 08/05/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing This project is being funded by the State Revolving Fund (SRF) and bidders must comply with all applicable state and federal requirements identified in the bid documents. Prospective contractors shall follow the Davis-Bacon and Related Acts that requires all laborers and mechanics employed by contractors and subcontractors be paid wages at rates not less than those listed on the prevailing wage rate contained in the contract documents and that all applicable provisions of the Davis-Bacon and Related Acts be met. Bidders must comply with all applicable state and federal requirements identified in the bid documents regarding "American Iron and Steel" provisions of the Consolidated Appropriations Act, 2014 (Section 426) For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.
Post-Bid
Water / Sewer
$200,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 12, 2025
September 11, 2025
Multiple Locations, Honea Path, SC
Related To This Project
Honea Path, SC
Bid Date: Aug 25 2025
Honea Path, SC
Bid Date: Aug 22 2025
Honea Path, SC
Bid Date: Oct 22 2025
Honea Path, SC
Bid Date: Feb 09 2026
Honea Path, SC
Bid Date: May 22 2025
Honea Path, SC
Bid Date: May 05 2025
Honea Path, SC
Bid Date: Mar 03 2025
Honea Path, SC
Bid Date: Feb 27 2025
Honea Path, SC
Bid Date: Dec 09 2024
Honea Path, SC
Bid Date: Dec 16 2024
Honea Path, SC
Bid Date: Dec 16 2024
Honea Path, SC
Bid Date: Dec 16 2024
Honea Path, SC
Bid Date: Aug 20 2024
Honea Path, SC
Bid Date: Jul 16 2024
Honea Path, SC
Bid Date: Jun 27 2024
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.