Site work for a road / highway in Hercules, California. Completed plans call for site work for a road / highway.

The Project is located 1,000 feet northeast along the San Francisco Bay Trail from the intersection of Bayfront Blvd. and John Muir Pkwy in the City of Hercules (38i 1/2 01'22.3"N, 122i 1/2 16'52.5"W), and is described as follows: In general, the wall repair work to be performed consists of mobilization, erosion control, grading work, removal and installation of concrete valley gutter/trench, and all other work as shown on the Plans. Time for Final Completion. The Project must be fully completed within 50 working days from the start date set forth in the Notice to Proceed. City anticipates that the Work will begin on or about September 2025, but the anticipated start date is provided solely for convenience and is neither certain nor binding. License and Registration Requirements. 3.1 License. This Project requires a valid California contractor's license for the following classification(s): Class A (General Engineering Contractor). The Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier's or certified check made payable to City, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond form included with the Contract Documents. The successful bidder will be required to provide performance and payment bonds, each for 100% of the Contract Price, as further specified in the Contract Documents. Questions or requests for clarifications regarding the Project, the bid procedures, or any of the Contract Documents must be submitted in writing to Jose Pacheco, Associate Engineer, at JPacheco@HerculesCA.gov with subject: BAY TRAIL SOIL NAIL WALL SINKHOLE REPAIR. Question Deadline 08/05/2025 Estimated Cost. The estimated construction cost is $80,000.

Award

Roads / Highways

$77,506.00

Public - City

Site Work

6

7

2

7

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
517
Active Projects
211
Bidding Soon
3,014
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2025

September 1, 2025

Project location map

John Muir Pkwy & Bayfront Blvd, Hercules, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.