Site work and paving for a civil project in Davis Creek, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
127EAW25R0049 - Lassen Creek Passage Restoration Modoc National Forest FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $500,000 and $1,000,000 Set Aside: Total Small Business Set Aside IMPORTANT NOTES: See Section L, Paragraph L.2 for the Documents to Submit with Your Proposal All Requests for Information (RFI's) shall be submitted to the Contracting Officer, Greg Cunningham, Gregory.Cunningham@usda.gov - on the attached RFI form not later than 1300 hours PST, August 19th, 2025. A FS organized pre-proposal site visit will NOT be held. The project locations are open to the public and can be viewed by each prospective offeror. In no event shall failure to inspect the site constitute grounds for a claim after contract award. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The scope of this project entails, but is not limited to, implementing an Aquatic Organism Passage (AOP) at the Lassen Creek crossing along Forest Route 45N02B. The current low-water crossing has excessive riverbed widening, resulting in effects on aquatic ecosystems, impacting aquatic species such as the Goose Lake red band trout and Goose Lake lamprey. This project encompasses all requisite labor, materials, equipment, and ancillary provisions essential for the successful construction of the AOP crossing, provided in the prescribed plans and technical specifications while restoring the streambed to its original morphological state using appropriate rock stabilization requirements. The Contractor shall be responsible for providing all labor, tools, material, and equipment necessary to perform all work in strict accordance with the specifications, drawings and industry standards. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for the items shown. Construct the AOP crossing utilizing an aluminum structural plate box culvert (14'5" width x 3'3" height x 27' length) founded upon a spread footing and stem wall system. o Reestablish the historical streambed width of approximately 9 feet, reinforcing stability through rock armoring techniques. o Implement comprehensive site security and preparatory measures to ensure the safety of personnel and the public. o Coordinate staging areas with prior approval from the Forest Service. o Conduct subsurface stabilization by executing the removal and replacement of compromised substrate and road surface deficiencies. o Reincorporate displaced berm materials into the road tread to optimize resource utilization and minimize material wastage. o Deposit, distribute, and compact aggregate layers to yield a structurally robust and traversable roadway. o Execute ecological restoration measures, including revegetation, topographical regrading, and hydrological reinstatement of impacted areas. o Guarantee full compliance with Federal Highway Administration (FHWA) specifications (FP-14) and National Forest System (NFS) road construction guidelines and supplemental specifications. o Institute traffic control protocols conforming to the Manual on Uniform Traffic Control Devices (MUTCD) standards. o Facilitate final site inspections and verification assessments in collaboration with the designated COR. PROJECT LOCATON Project is located 25 miles North of Alturas to Davis Creek via US-395. Turn right onto City Road 133C and follow the road until arrive at Forest Service 30 ~7 miles. Turn right onto Forest Road 30 and destination is on the left ~1 mile down the road. Coordinates provided in the project plans. Completion- 150 Calander days: anticipated mobilization Spring 2026
Post-Bid
Water / Sewer
$1,000,000.00
Public - Federal
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 29, 2025
March 20, 2026
To Be Determined, Davis Creek, CA
Related To This Project
Davis Creek, CA
Bid Date: Oct 07 2025
Davis Creek, CA
Bid Date: Apr 17 2025
Davis Creek, CA
Bid Date: Jan 30 2024
Davis Creek, CA
Bid Date: Jun 30 2023
Huntington Beach, CA
Bid Date: Jul 31 2025
San Diego, CA
Bid Date: Aug 19 2025
Los Angeles, CA
Bid Date: Jul 28 2025
San Bernardino, CA
Bid Date: Jul 31 2025
Quincy, CA
Bid Date: Aug 14 2025
Santa Rosa, CA
Bid Date: Aug 13 2025
San Jose, CA
Bid Date: Jul 16 2025
La Verne, CA
Bid Date: Aug 07 2025
Claremont, CA
Bid Date: Aug 14 2025
Cupertino, CA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.