Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 9, 2025 at 8:00 PM
Updated September 10, 2025
Site work and renovation of a bridge / tunnel in Quincy, California. Completed plans call for the renovation of a bridge / tunnel; and for site work for a bridge / tunnel.
127EAW25R0044 - Disaster, Chamber Creek Bridge Repair Plumas National Forest - The contractor shall furnish and supply all necessary materials, supplies, equipment and personnel to remove and replace Chambers Creek Trail bridge, including but not limited to clearing and grubbing, approach construction, removal and disposal of existing bridge, concrete abutment retrofit construction, prefabricated bridge design, bridge fabrication, delivery and placement with timber decking. Removal of existing bridge, Disposal Method A and D as per plans and specifications o Existing steel structure contains lead paint. Hazardous material must be contained and disposed of according to all relevant local, state and federal regulations. o Constructing trail bridge approaches, including excavation and embankment. o Includes excavation, embankment and backfill construction required to shape and finish the trail bed, backslopes and fill slopes. The anticipated commencement date for this project is September 1, 2025 FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $500,000 and $1,000,000 Set Aside: Total Small Business Set Aside IMPORTANT NOTES: Refer to Section L, Paragraph L.2, on Page 33 for detailed instructions regarding the submission of proposals, including the required documents and information to be provided. All Requests for Information (RFI's) shall be submitted to the Contract Specialist, Tanya Torres on the attached RFI form not later than 1000 AM hours PST, August 4th, 2025. An organized site visit is scheduled for July 29th, 2025 at 0900 AM hours PDT. please refer to page 37 for detailed information regarding the site visit. In no event shall failure to inspect the site constitute grounds for a claim after contract award. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Bridges / Tunnels
$554,912.00
Public - Federal
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 14, 2025
September 1, 2025
39696 CA-70, Quincy, CA
Related To This Project
Quincy, CA
--
Quincy, CA
Bid Date: Jul 21 2025
Quincy, CA
Bid Date: Jul 31 2025
Quincy, CA
Bid Date: Oct 17 2025
Quincy, CA
Bid Date: Dec 01 2025
Quincy, CA
Bid Date: Dec 01 2025
Quincy, CA
Bid Date: Dec 01 2025
Quincy, CA
Bid Date: Jul 01 2025
Quincy, CA
Bid Date: Jun 24 2025
Quincy, CA
Bid Date: May 28 2025
Quincy, CA
Bid Date: Apr 03 2025
Quincy, CA
Bid Date: Apr 03 2025
Quincy, CA
Bid Date: Apr 03 2025
Quincy, CA
Bid Date: Apr 03 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
