Published August 7, 2025 at 8:00 PM

Updated August 9, 2025

Renovation of a power facility in Benson, Arizona. Completed plans call for the renovation of a power facility.

Adams Substation (Ada) Hvac Units Replacement, Western Area Power Administration, Desert Southwest Region, Cochise County, Az 85602 Any questions to be answered during the site visit must be submitted via N/A no later than N/A. All questions shall be submitted via e-mail to villareal@wapa.gov no later than 10:00am PT, 22 July 2025. Written questions will also be taken at the site visit, but answers may not be provided at that time. All questions and answers, including those answered and not answered at the site visit will be provided via FedConnect. The project magnitude is estimated between $25,000 and $100,000. The NAICS code is 238220 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Western Area Power Administration (WAPA), Desert Southwest Region (DSW), requires the services of a qualified Contractor to perform all aspects of HVAC work as set forth in this Scope of Work (SOW). These Specifications describes the services required by DSW for its Adams Tap Substation in Cochise County, AZ 85602. The Contractor shall provide all labor, equipment and materials to replace two HVAC systems for all the specified substations a. The Contractor shall provide qualified, trained, skilled personnel for work performed, installation of required material, and usage of equipment under this SOW. All equipment shall comply with applicable OSHA guidelines and shall be in good operating condition. The Contractor shall operate the equipment in accordance with the original manufacturer's recommendation and applicable laws and regulations. b. All substations shall have a HEPA filter for all outside air intakes and a pleated filter for all inside return air systems. c. The contractor shall provide the kW rating for each substation heater based on compliance with design requirements and codes. The contractor shall also ensure that the electrical circuits (circuit breaker size, wire size, conduit size, disconnect size, fuse size) are rated for the new equipment and NEC. d. All ductwork shall be sized per current codes and installed per Construction Standard 11. e. Disposal of Waste Material.

Post-Bid

Power Plant

$100,000.00

Public - Federal

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
21
Bidding Soon
214
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.