BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 1, 2025 at 8:00 PM

Updated October 2, 2025

Site work and paving for a civil project in Visalia, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

**As of October 01, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** construction of improvements consisting of a new 400 gallon per minute (gpm) water well pump, granular activated carbon (GAC) treatment units, 8,000 gallon hydropneumatic tank, 45,000 gallon above-ground storage tank, pipe and pipelines, valves, appurtenances, connections, District-supplied generator and automatic transfer switch (ATS) installation and testing, electrical equipment and wiring, concrete, foundations and site surfacing (Work) at its Front Street Well site. The award will be made to the lowest responsive, responsible Bidder in accordance with the Contract Documents, but the District reserves the right to reject any and all Bids and waive minor discrepancies in the Bid. Copies of the Contract Documents are on file and may be examined at the office of the Engineers. A time limit for the final completion of the Work of four hundred twenty-five (425) calendar days has been set and liquidated damages shall be assessed according to the Contract Documents for each calendar day thereafter that the Work is not completed.

Bid Results

Water / Sewer

$3,176,884.00

Public - City

Paving, Site Work

12

14

11

6

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
42
Bidding Soon
686
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2025

October 28, 2025

Project location map

Multiple Locations, Visalia, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.