BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 14, 2025 at 8:00 PM

Updated August 15, 2025

Renovation of a residential development in Grand Coteau, Louisiana. Completed plans call for the renovation of a residential development.

This project consists of complete interior modernization of two (2) two-bedroom living units at Site LA-73-5 (Pine Crest) in Sunset, LA. Modernization includes new exterior doors & frames, exterior storm doors, windows, interior doors & frames, door hardware, flooring, wood base & shoe, gas wall heater/s, gas water heaters, plumbing fixtures, Kitchen cabinets & countertops, synthetic marble tub/shower surround, gypsum wall board, electrical wiring, receptacles, electrical panels, light fixtures, painting. Work also includes complete renovation of bathrooms (only) at two (2) living units in Grand Coteau, LA. Work also includes removal of existing and replacement with new gas wall heaters at three (3) living units at various sites in Grand Coteau and Arnaudville, LA. Bids shall be submitted in a sealed envelope, with the following information plainly marked on the outside of the envelope: 1. A Bid for South Landry Housing 2023 CFP Modernization 2. Name of Contractor, and 3. License Number of Contractor. The full amount of deposit for 1 set will be refunded to each prime Bidder who submits a bona fide bid upon return of such set in good condition within 10 days after date of opening bids. All other deposits for complete sets will be refunded with deductions of 50% approximating reproduction and mailing costs upon return of same in good condition within 10 days after date of opening bids. Otherwise, the entire deposit may be retained by the Architect. Partial sets of documents will not be issued. No bid may be withdrawn for a period of 60 days after the time and date of opening. Bid must be accompanied by a bid bond in an amount not less than five percent of base bid. Both performance and payment bonds will be required in an amount equal to 100 percent of the Contract Price. The Owner reserves the right to reject any or all bids and to waive technicalities and informalities. Question Deadline 07/28/2025 Any prospective bidder desiring an explanation or interpretation of the solicitation, specifications, drawings, etc., must request it at least 7 days before the scheduled time for bid opening. Requests may be oral or written. Oral requests must be confirmed in writing.

Award

Residential Subdivision

$231,600.00

Public - City

Renovation

13

25

4

6

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
76
Bidding Soon
743
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2025

September 5, 2025

Project location map

400 Crepe Myrtle Drive, Grand Coteau, LA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.