Updated September 9, 2025

Renovation of a mixed-use development in Midland, Michigan. Completed plans call for the renovation of a educational facility.

The scope of work must include but is not limited to: removing the existing fire alarm system, design of a new fire alarm system and the installation of that system. Work to include but not limited to: • Design and CAD plan documentation of a new Fire Alarm system following the Michigan Fire Prevention Code, PA207, along with the State Fire Safety Board fire safety rules. • Submittal to the State of Michigan Bureau of Fire Services for plan review • All responses to state reviews to complete the project. • Removal of existing equipment and devices as required. The district will approve or deny the use of existing equipment.The scope of work must include but is not limited to: removing the existing fire alarm system, design of a new fire alarm system and the installation of that system. Work to include but not limited to: • Design and CAD plan documentation of a new Fire Alarm system following the Michigan Fire Prevention Code, PA207, along with the State Fire Safety Board fire safety rules. • Submittal to the State of Michigan Bureau of Fire Services for plan review • All responses to state reviews to complete the project. • Removal of existing equipment and devices as required. The district will approve or deny the use of existing equipment. • Supply and Installation of a new Fire Alarm system to include devices and wiring. • All conduit is to be ran in ceilings and walls whenever possible for the new installation. All visual conduits shall be placed in wire mold with a color agreed upon by the district. • All final reviews and documentation required by the State of Michigan for Building Occupancy. • Training for District Employees on the operation of the fire alarm system. • Supply and Installation of a new Fire Alarm system to include devices and wiring. • All conduit is to be ran in ceilings and walls whenever possible for the new installation. All visual conduits shall be placed in wire mold with a color agreed upon by the district. • All final reviews and documentation required by the State of Michigan for Building Occupancy. • Training for District Employees on the operation of the fire alarm system. Questions should be referred to Michael Moeggenberg, Director of Facilities and Operations at 989-923-5035 or moeggenbergmj@midlandps.org

Award

Educational

$60,516.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2025

August 28, 2025

Project location map

215 Fast Ice Dr, Midland, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.