BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2025 at 8:00 PM

Updated September 10, 2025

Site work and paving for a road / highway in Midland, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

1.66 mi of hot mix asphalt base crushing, shaping, and resurfacing, shoulder widening, intersection improvements, and permanent pavement markings on Eastman Road from Baker Road to Bombay Road, Midland County. This is a Local Agency project. 6% DBE Participation Required In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Ea. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. Net classification required for this project is 890 Cb Control Sec Job No Federal No STL 56000 216505A 25A0783 Completion Date: 11/14/2025 MIDOT - 2509 021 - Hot Mix Asphalt Base Crushing, Shaping, and Resurfacing - Eastman Road Question Deadline 08/29/2025 seven (7) calendar days before the letting

Award

Roads / Highways

$680,145.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2025

September 15, 2025

Project location map

N Eastman Rd, Midland, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.