BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 9, 2025 at 8:00 PM

Updated October 10, 2025

Site work for a civil project in Standish, Michigan. Completed plans call for site work for a water / sewer project.

**As of October 9th, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The Project includes the following Work: 1) Project Location 1: Improvements at Project 1 include replacement of two (2) self-priming pumps and associated motors, two (2) variable frequency drives (VFD), a common control panel, level instrumentation (radar and backup floats), main disconnect, manual transfer switch, sump pump, dehumidifier, and telemetry (autodialer). Visual evidence of deterioration of the pipe coating system in the dry well demonstrates a need to re-coat existing piping/valves to remain. 2) Project Location 2: Improvements at Project 2 include replacement of two (2) self-priming pumps and associated motors, a common control panel, level instrumentation (backup floats replaced only), manual transfer switch, main disconnect, and telemetry (autodialer). 3) Project Location 3: Improvements include replacement of three (3) vertical sewage pumps, motors, two (2) VFDs, soft starter, electrical panel, two (2) flow meters, exhaust fan, automatic transfer switch and installation of a permanent onsite diesel generator. 4) Project Location 4: a) Transfer Pump Station: Improvements at the Transfer Pump Station include replacement of two (2) submersible pumps, and control panel. b) Wastewater Treatment Plant: (1) At the main floor level of the Main Building, the following improvements will occur: (a) Replacement of an existing 200 kw permanent diesel generator and automatic transfer switch. (b) Replacement of one (1) sampling pump in the Alum room. (c) Furnish one (1) sample pump for stock spare. (d) Replacement of one (1) refrigerated autosampler at Inlet Structure No. 1 along with associated electrical outlet. (e) Transitioning overhead fixtures to LED-type. (2) Within the basement of the Main Building, there are three (3) UV units that are in use and have exceeded their useful life. Improvements will include replacement of the three UV units and associated control panels. (3) At the central area of the aerated lagoons is a Blower Building. Within the Blower Building, two (2) 20 horsepower (hp) 310 scfm blowers and motors and one (1) 60 hp 1150 scfm blower and motor will be replaced. Question Deadline 08/11/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Contact Alisha Busuttil, PE, Project Manager, OHM Advisors, e-mail address: Alisha.Busuttil@ohm-advisors.com, telephone number 231-344-1163 Questions received less than seven days prior to the date for opening of Bids may not be answered.

Bid Results

Water / Sewer

$2,597,093.00

Public - City

Site Work

48

23

2

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2025

October 17, 2025

Project location map

Multiple Locations, Standish, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.