Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 26, 2026 at 8:00 PM
Updated May 27, 2026
Site work and paving for a mixed-use development in West Milford, New Jersey. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.
Contractors Prequalified in one of these Work Types are eligible to bid this project: 2, 2b, 3, 3a, or 5 Estimated Range $20,000,001 to $35,000,000 The Principal Items of Work Consist of: Roadway Quantity Unit Description 11,885 Cy Excavation, Unclassified 15,801 T Stone Matrix Asphalt 12.5 Mm Surface Course 6,977 T Binder Rich Intermedite Course 111,641 Sy High Friction Surface Treatment 6,000 Lf Construction Barrier Curb 25,356 Lf Beam Guide Rail Bridge: Quantity Unit Description 500 Lf Concrete Bridge Parapet With Moment Slab, Hpc 600 Lf Drilled Shift in Soil 36" Diameter 270 Lf Drilled Shift in Rock 36" Diameter 1,672 Ls Retaining Wall, Location No. 5,250 Lf Vibration Monitoring 82,000 Lb Reinforcement Steel, Epoxy Coated Pursuant to N.J.S.A. 34:11-56.35(d), if the Commissioner of the Department of Labor and Workforce Development (LWD Commissioner) makes an initial determination that an employer has violated the provisions of P.L.1963, c.150 (C.34:11-56.25 et seq.) by paying wages at rates less than the rates applicable under that act, the LWD Commissioner may immediately issue a stop-work order to cease all business operations at every site where the violation has occurred, and may assess a civil penalty of $5,000 per day against the employer for each day it conducts business operations in violation of the stop-work order. If the stop-work order is issued against a subcontractor, the general contractor may terminate that subcontractor from the project in accordance with N.J.S.A. 34:11-56.35(d). DOT reserves its right to reject any or all bids in accordance with N.J.S.A. 27:7-30 and N.J.S.A. 27:7-33. NJDOT: 101 - Route 23, High Crest Drive to Macopin River *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. the deadline for summation inquiry will not be extend and is ar 12.00 AM ON MAY 21 2026 AS PER ADDA 3.
GC Bidding
Bridges / Tunnels
$35,000,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 3, 2026
July 31, 2026
NJ-23, West Milford, NJ
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
