BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2025 at 8:00 PM

Updated September 10, 2025

Site work for a water / sewer project in Boise, Idaho. Completed plans call for site work for a water / sewer project.

construction of approximately 388 L.F. of 8" sewer main pipe, 264 L.F. of 4" sewer service pipe, new manhole installation, and other related work located on W. Goldenrod Ave. between N. Lancer Ave. and N. Cloverdale Rd. in the Boise City Service Area, Ada County, Idaho as set forth in the Contract documents for Sourcing Event # SFB2025-077 (CSP 1202), Goldenrod Service Line Extensions The City of Boise reserves the right to reject any and all Bids, to waive any irregularities in the Bids received and to accept the bid(s) that are in the best interest of the City. Boise City is an Equal Opportunity Employer. The City of Boise is exempt from Federal and State taxes and will execute the required exemption certificates. All E-Bids must be submitted before the scheduled Bid opening. In the event of a technology failure, the City reserves the right to accept all Bids submitted and electronically time stamped prior to Bid opening. The City will require Bid receipt document to be on file as proof of timely submission. Bidders are encouraged to confirm the successful up-load of their Bid document. The City will not accept Bids after the scheduled time for opening. In determining the lowest responsive bid, the Owner will consider all acceptable bids on a basis consistent with the bid package. The City reserves the right to reject any or all proposals, waive any nonmaterial irregularities in the bids received, and to accept the proposal deemed most advantageous to the best interest of the City. 8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of 5% of Bidder's maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Such Bid bond will be issued in the form included in the Bidding Documents. 8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract, furnished the required Contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract and furnish the required Contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited, in whole in the case of a penal sum bid bond, and to the extent of Owner's damages in the case of a damages-form bond. Such forfeiture will be Owner's exclusive remedy if Bidder defaults. 8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of 7 days after the Effective Date of the Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released. 8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within two weeks after the Bid opening. Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work. The number of days within which, or the dates by which, the Work is to be (a) substantially completed is 25 days and 30 days completion time (b) ready for final payment, and (c) Milestones (if any) are to be achieved, are set forth in the Agreement. Substantial Completion: Contractor shall pay Owner $500 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified above for Substantial Completion, until the Work is substantially complete.

Award

Water / Sewer

$150,777.00

Public - City

Site Work

7

12

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
28
Bidding Soon
324
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2025

September 5, 2025

Project location map

W Goldenrod Ave, Boise, ID

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.