Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 26, 2025 at 8:00 PM
Updated August 27, 2025
Site work, paving and outdoor lighting for a mixed-use development in Fremont, Nebraska. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Furnishing all labor, tools, materials and equipment required to construct 23RD STREET TURN LANE IMPROVEMENTS for the City of Fremont, Nebraska, as per the plans and specifications for said work, at the locations shown on the detailed drawings and in the specifications now on file with the City Clerk of the City of Fremont, Nebraska and available at the office of E & A Consulting Group, Inc.,. The work consists essentially of the following estimated quantities:APPROXIMATE QUANTITIES MOBILIZATION/DEMOBILIZATION 1LS2 CLEARING AND GRUBBING - GENERAL 1LS3 SAWING PAVEMENT2,804LF4 REMOVE PAVEMENT 2,625SY5 REMOVE WALK7SY6REMOVE CONCRETE MEDIAN SURFACING1,751SY7 REMOVE AND RELOCATE SIGN &POST 9EA8 REMOVE UTILITY VAULT2EA9REMOVE PEDESTAL POLE1EA10EARTHWORK MEASURED IN EMBANKMENT 668CY11CONSTRUCT 9" CONCRETE PAVEMENT (CLASS47B-3500)3,587SY12 CONSTRUCT 9" CONCRETE PAVEMENT W/ INTEGRAL CURB (CLASS 47B-3500)1,264SY134" FOUNDATION COURSE4,851SY14SUBGRADEPREPARATION4,851SY15 CONSTRUCT 4" CONCRETE SIDEWALK (CLASS 47B-3000)5SY16TIE BARS1,249EA17CONSTRUCT 6" CONCRETE MEDIAN SURFACING (CLASS47B-3000)960SY18INSTALL STREET LIGHT BASE8EA19INSTALL PULL BOX2EA20INSTALL CONDUIT AND CONDUCTOR2,000LF21ADJUST PULL BOX TOGRADE1EA22ADJUST WATER VALVE TO GRADE1EA23ADJUST SANITARY MANHOLE TO GRADE1EA24RELOCATE PEDESTRIAN PUSH BUTTON1EA25CONSTRUCTDETECTABLE WARNING PANEL8SF26FABRIC SILT FENCE - LOW POROSITY2,145LF27CURB INLET PROTECTION1EA28SEEDING, TYPE B0.5AC29MULCH1.1TON306" WHITEREFLECTIVE POLYUREA PAVEMENT MARKING, GROOVED3,605LF316" YELLOW POLYUREA CURB PAVEMENT MARKING1,160LF32TRAFFIC CONTROL1LS The amount of the engineer's estimate of the cost of said improvements (exclusive of engineering, fiscal, legal, interest, easement acquisition, and miscellaneous costs) is $902,800. All proposals must be submitted on bid forms furnished by E & A Consulting Group, Inc., and must be accompanied by an original bid bond or a certified check in the amount not less than $45,140 made payable to the City Clerk of the City of Fremont, Nebraska as security that the bidder to whom the contract may be awarded will enter into a contract to build the improvements in accordance with this Notice to Contractors and will give a contract and maintenance bond in the amount of 100% of the total contract price, all as provided in the specifications. No bidder may withdraw his proposal for a period of sixty (60) days after date set for opening of bids. All proposals must be enclosed in an envelope, sealed and addressed to the "The City Clerk of the City of Fremont, Nebraska" and shall be marked "PROPOSAL FOR 23RD STREET TURN LANE IMPROVEMENTS" with the bidder's name and address on said envelope. The Bid Security shall be in a separate sealed envelope attached to the Proposal envelope and shall be marked "BID SECURITY" with the project identified thereon. The City of Fremont, Nebraska, reserves the right to reject any or all bids received and to waive informalities and irregularities.
Award
Sidewalks / Parking Lot
$797,639.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 13, 2025
September 12, 2025
W 23rd St, Fremont, NE
Related To This Project
Fremont, NE
Bid Date: Aug 04 2025
Fremont, NE
Bid Date: Aug 13 2025
Fremont, NE
Bid Date: Aug 19 2025
Fremont, NE
Bid Date: Sep 15 2025
Fremont, NE
Bid Date: Sep 23 2025
Fremont, NE
Bid Date: Sep 23 2025
Fremont, NE
Bid Date: Oct 02 2025
Fremont, NE
Bid Date: Nov 04 2025
Fremont, NE
Bid Date: Jul 11 2025
Fremont, NE
Bid Date: Jul 28 2025
Fremont, NE
Bid Date: Jul 22 2025
Fremont, NE
Bid Date: Jul 08 2025
Fremont, NE
Bid Date: Jul 01 2025
Fremont, NE
Bid Date: Jun 16 2025
Fremont, NE
Bid Date: Jul 18 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
