Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 29, 2025 at 8:00 PM

Updated September 9, 2025

Site work and new construction of a municipal facility in Richton Park, Illinois. Completed plans call for the construction of a 19,000-square-foot municipal facility; and for site work for a municipal facility.

The proposed project includes designing, building, equipping, and furnishing a new 19,000 square foot Village Hall and Site Development on a previously developed parcel owned by the Owner. The new Village Hall will host Board, Administrative, Finance, and Economic/Community Development functions located at: Intersection of Sauk Trail Road and Governors Highway, West of the existing Metra Rail Line on existing Owner owned property. For the New Village Hall Building, including site development, as described in the Request for Qualifications and Request for Proposals (the "RFQ / RFP") to submit Statements of Qualification and Proposals as set forth in Illinois State Statute 105 ILCS 5/15/A-5. Offerors should submit three (3) printed copies of Proposals to the Owner per the RFQ instructions in a sealed envelope. Offerors should submit one electronic copy via email to Design Criteria Consultant at tedm@themesarchitecture.com. The SOQ shall be submitted on or before the above date and time and can be combined in one binder. Each response to the RFQ (and any subsequent RFP) must be in accordance with the RFQ (and any subsequent RFP), and Illinois design build laws. ***Note: Please be advised that the Village of Richton Park, IL will be extending the issuance of the RFQ / RFP For Design Build Contract previously published until 7/31/25.*** QA date - 22 August 2025 2:00 PM Last Day for interested Offerors to Submit RFQ Questions Substantial Completion in Fall 2027 calendar year.

Post-Bid

Municipal

$17,600,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
595
Active Projects
331
Bidding Soon
3,756
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2025

May 8, 2026

Project location map

Sauk Trail & Governors Hwy, Richton Park, IL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed