BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 23, 2025 at 8:00 PM

Updated August 8, 2025

Renovation of a mixed-use development in Durham, North Carolina. Completed plans call for the renovation of a educational facility.

The two buildings house science and research laboratories and classrooms; the hot water and chilled water systems are shared. Phase 1 will prioritize utility upgrades for both buildings: chillers, cooling towers, chilled and heating hot water pumps, vacuum system and all associated controls. Additionally, the highest priority air handlers, exhaust fans, terminal units and all associated controls will be replaced, as well as highest priority fume hoods and fume hood controllers NCCU reserves the option to retain the Phase 1 design team

Post-Bid

Laboratories

$15,000,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
241
Active Projects
144
Bidding Soon
1,709
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2025

October 7, 2025

Project location map

1801 Fayetteville St, Durham, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.