BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 1, 2025 at 8:00 PM

Updated October 3, 2025

Renovation of a library in Chesterton, Indiana. Completed plans call for the renovation of a library.

** As of September 10, 2025. Project has not been awarded yet. A timeline for award ahs not yet been established ** Question Deadline 07/31/2025 RFIs are required to be submitted to the Architect within seven (7) consecutive calendar days of the bid due date and time. The work consists of furnishing all labor, materials, equipment, supplies, transportation, fuel, superintendence, temporary construction facilities, insurance, taxes, permits, fees and all other services and facilities, except as stated to be furnished by others, necessary to complete the work as called for on the plans and/or herein specified. Bids received after the above stated time and date as specified, shall be returned to the sender unopened and declared non-acceptable. Prime bids will be received per the Bid Form for: General Construction at each building and a combination bid for all three buildings. All Bidders must submit a satisfactory bid bond executed by the bidder and surety company or a certified check or bank draft, payable to the Westchester Public Library in an amount equal to five percent (5%) of their maximum bid, as provided by law. For Bids over $200,000 the successful Bidder, within ten(10) days of acceptance of bids, will be required to execute a performance bond requiring one hundred percent(100%) performance and one hundred percent (100%) labor and material payment. All bids shall be sealed in an envelope and submitted on the Bid Proposal Form in the Project Manual obtained from the office of CSK Architects, P.C., 6919 W. Lincoln Highway, Crown Point, 46307. The Westchester Public Library reserves the right to reject any or all bids, to waive any informalities in bidding, or to return unopened any proposal received after the time fixed herein. No Base Bidor Alternates shall be withdrawn for a period of sixty (60) days, subsequent to the opening of bids.

Award

Library

$1,410,200.00

Public - City

Renovation

11

13

12

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2025

September 8, 2025

Project location map

Multiple Locations, Chesterton, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.