BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 5, 2025 at 8:00 PM

Updated August 6, 2025

Renovation of a municipal facility in Chesterton, Indiana. Completed plans call for the renovation of a 8,750-square-foot municipal facility.

Maintenance Shop Flooring Replacement The Northern Indiana Commuter Transportation District (NICTD) is seeking sealed bids from qualified contractors to furnish all labor, materials, and equipment required to remove and replace approximately 8,750 square feet of wood block flooring with reinforced concrete in three phases, including jib crane foundation work, forming around existing rail, applying concrete sealant, and performing associated demolition, preparation, and protection tasks as specified. Question Deadline 05/20/2025 at 3:00 PM CT Questions via telephone or person to person are not accepted. All questions must be submitted by email to Alex Largen at alexandra.largen@nictd.com NICTD's Disadvantaged Business Enterprise (DBE) participation goal for this project is ten percent (10%) of the bid price. Bidders are required to make good faith efforts to meet or exceed the District's goal. NICTD will award the Contract to the lowest responsive and responsible bidder. NICTD reserves the right to reject any and all bids and waive technical defects if, in its judgment, the interests of NICTD so require. NICTD reserves the right to accept any bid within 60 days after the time of the opening of the bids, during which no bid shall be withdrawn. Anticipated Award Date: July 28, 2025 The contractor will pour 4,000 psi concrete reinforced with steel fibers to a 4-inch depth, including forming 2"x2" flangeways around the existing track rail. Additional tasks include the removal and replacement of a 7'x7' concrete slab for a jib crane foundation, installation of reinforcing bars, and casting 12 anchors, followed by concrete pouring to fill to grade. The contractor will apply a liquid densifier and sealer on the new concrete, sawcut control joints, and perform miscellaneous grinding to correct transitions. The project will require careful coordination to ensure continued NICTD access and operations, with protection measures for each work area and a 2-3 week cure time between phases. Questions are due by 3 pm CT on Tuesday, May 27, 2025

Award

Municipal

$185,404.00

Public - State/Provincial

Renovation

3

5

8

7

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
448
Active Projects
261
Bidding Soon
3,289
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 19, 2025

July 21, 2025

Project location map

To Be Determined, Chesterton, IN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.