BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 24, 2025 at 8:00 PM

Updated September 25, 2025

Site work for a water / sewer project in Rancho Santa Margarita, California. Completed plans call for site work for a water / sewer project.

License Requirements Class A, Class C-61/D12 The Upper Chiquita Reservoir's floating cover sump pump discharge hose has reached its service life. This project will replace all of the floating cover's sump pump discharge hoses, check valves, fittings, tees, camlocks, and hypalon fitting covers. In addition, some of the hose attachments and grommets will be replaced. The Contractor shall perform all Work within the time stipulated the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Work: Upper Chiquita Reservoir - Replacement of Cover Sump Hoses The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor's failure to comply with this obligation. Question Deadline 08/12/2025 at 2:00 PM PT Online Q&A Yes The Work shall commence on the date stated in the District's Notice to Proceed. The Contractor shall complete all Work required by the Contract Documents within 90 calendar days from the commencement date stated in the Notice to Proceed

Award

Water / Sewer

$426,370.00

Public - County

Site Work

30

22

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
1
Bidding Soon
1,959
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2025

September 18, 2025

Project location map

21355 Oso Pkwy, Rancho Santa Margarita, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.