BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 27, 2025 at 8:00 PM

Updated August 28, 2025

Site work for a playground / park / athletic field in Burlington, Massachusetts. Completed plans call for site work for a playground / park / athletic field.

For the following Rahanis Park Basketball Court Renovation Question Deadline 08/01/2025 Questions concerning this Invitation for Bids must be submitted in writing to: Rachel Leonardo at rleonardo@burlington.org at least 5 days prior to the bid opening date. Written responses will be emailed to all bidders on record as having picked up the Invitation for Bids. The Town of Burlington reserves the right to reject any and all bids or to waive any informality in the proposal process, if deemed in the Towns best interest. Renovate existing basketball courts, install new basketball support systems and perimeter fencing Work Scope Summary: o Notify Dig Safe o Provide and install sedimentation control o Remove and dispose of existing basketball support systems o Remove @ 160' of galvanized chain-link fencing o Remove @ 50' of 10' black chain-link fence behind basket on Mill St. side of court; dispose of posts and rails; save fabric to re-use o Remove existing telephone pole (no wiring to pole) o Install new True Bounce basketball support systems to be supplied by Town of Burlington Paving: Furnish all labor, material and equipment to remove or pulverize the existing paved surface 49'x139' and two (2) basketball standards and rebuild to the new dimensions of 125'x56' as outlined below: 1. Pulverize or remove the existing paved surface and the two (2) basketball standards. 2. Remove the area where the court is being widened, compact and install 12" of processed stone. 3. Regrade, removing any excess material and compact. 4. Supply and install 2" of hot bituminous concrete binder after compaction. 5. Install the basketball poles per manufacturer's specifications. 6. Supply, install and compact 1-1/2" of dense bituminous concrete finish after compaction. 7. Water test for low areas. 8. Correct any low areas 21 days after paving has been done. 9. Town to accept paving prior to the color coating being done. 0. Install the basketball backboards. 11. Apply two (2) coats of Latexite, or equal, acrylic resurfacer mixed with 5-10 pounds of 50-60 mesh silica sand per gallon of resurfacer and applied at a rate of at least .07 gallons per square yard. Paint color to be determined by Burlington Parks & Recreation. 12. Apply two (2) coats of Latexite combo textured surface. Applied at a rate of a minimum of .05 gallons per square yard. 13. Layout, mask with tape and hand paint, one (1) basketball court and two (2) four squares with a paintbrush using 100% acrylic textured line paint by Dalton. 14. Clean up general work area. 15. Regrade, loam and seed the landscaping damaged by the equipment gaining access to the court. 16. Install the basketball rims, nets and pads. Fencing: The specifications for the fencing are as follows: Install 160' of 6' black chain-link fence along woods with 6 gauge black wire, top and bottom rail and tie into existing fence where applicable Install 50' of saved black chain-link fence behind basket (Mill St. side of court), top and bottom rail

Bid Results

Playgrounds / Parks / Athletic Fields

$114,507.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
566
Active Projects
259
Bidding Soon
3,887
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2025

September 1, 2025

Project location map

84 Mill St, Burlington, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.