Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 27, 2025 at 8:00 PM
Updated August 28, 2025
Site work for a playground / park / athletic field in Burlington, Massachusetts. Completed plans call for site work for a playground / park / athletic field.
For the following Rahanis Park Basketball Court Renovation Question Deadline 08/01/2025 Questions concerning this Invitation for Bids must be submitted in writing to: Rachel Leonardo at rleonardo@burlington.org at least 5 days prior to the bid opening date. Written responses will be emailed to all bidders on record as having picked up the Invitation for Bids. The Town of Burlington reserves the right to reject any and all bids or to waive any informality in the proposal process, if deemed in the Towns best interest. Renovate existing basketball courts, install new basketball support systems and perimeter fencing Work Scope Summary: o Notify Dig Safe o Provide and install sedimentation control o Remove and dispose of existing basketball support systems o Remove @ 160' of galvanized chain-link fencing o Remove @ 50' of 10' black chain-link fence behind basket on Mill St. side of court; dispose of posts and rails; save fabric to re-use o Remove existing telephone pole (no wiring to pole) o Install new True Bounce basketball support systems to be supplied by Town of Burlington Paving: Furnish all labor, material and equipment to remove or pulverize the existing paved surface 49'x139' and two (2) basketball standards and rebuild to the new dimensions of 125'x56' as outlined below: 1. Pulverize or remove the existing paved surface and the two (2) basketball standards. 2. Remove the area where the court is being widened, compact and install 12" of processed stone. 3. Regrade, removing any excess material and compact. 4. Supply and install 2" of hot bituminous concrete binder after compaction. 5. Install the basketball poles per manufacturer's specifications. 6. Supply, install and compact 1-1/2" of dense bituminous concrete finish after compaction. 7. Water test for low areas. 8. Correct any low areas 21 days after paving has been done. 9. Town to accept paving prior to the color coating being done. 0. Install the basketball backboards. 11. Apply two (2) coats of Latexite, or equal, acrylic resurfacer mixed with 5-10 pounds of 50-60 mesh silica sand per gallon of resurfacer and applied at a rate of at least .07 gallons per square yard. Paint color to be determined by Burlington Parks & Recreation. 12. Apply two (2) coats of Latexite combo textured surface. Applied at a rate of a minimum of .05 gallons per square yard. 13. Layout, mask with tape and hand paint, one (1) basketball court and two (2) four squares with a paintbrush using 100% acrylic textured line paint by Dalton. 14. Clean up general work area. 15. Regrade, loam and seed the landscaping damaged by the equipment gaining access to the court. 16. Install the basketball rims, nets and pads. Fencing: The specifications for the fencing are as follows: Install 160' of 6' black chain-link fence along woods with 6 gauge black wire, top and bottom rail and tie into existing fence where applicable Install 50' of saved black chain-link fence behind basket (Mill St. side of court), top and bottom rail
Bid Results
Playgrounds / Parks / Athletic Fields
$114,507.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 7, 2025
September 1, 2025
84 Mill St, Burlington, MA
Related To This Project
Burlington, MA
Bid Date: Jul 31 2025
Burlington, MA
--
Burlington, MA
Bid Date: Aug 20 2025
Burlington, MA
Bid Date: Aug 27 2025
Burlington, MA
Bid Date: Oct 10 2025
Burlington, MA
Bid Date: Sep 23 2025
Burlington, MA
Bid Date: Sep 16 2025
Burlington, MA
Bid Date: Oct 01 2025
Burlington, MA
Bid Date: Aug 08 2025
Burlington, MA
Bid Date: Aug 28 2025
Burlington, MA
Bid Date: Aug 20 2025
Burlington, MA
Bid Date: Aug 19 2025
Burlington, MA
--
Burlington, MA
Bid Date: Jul 21 2025
Burlington, MA
Bid Date: Jul 21 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
