BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 19, 2025 at 8:00 PM

Updated September 20, 2025

Site work and paving for a road / highway in Chelmsford, Massachusetts. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Remove and reconstruct bituminous drive aisle. Tree protection. Erosion control measures. Pavement markings. Crushed stone and filter fabric installation. Loam and hydroseed. Sign post removal and new pole & sign installation. Associated minor site improvements. The work is estimated to cost $39,000.00. Requests for Information (RFIs) shall be submitted to electronic by 8/05/25 @ 10:00 A.M. for general bids. Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The Workforce Participation benchmark is set at 6.9% for women and 15.3% for minorities. The Project shall consist of, but not limited to: o Remove and reconstruct bituminous sidewalk. Minimum 8" base material, minimum 3.5" asphalt (binder and top). 95% compaction. o Remove and reconstruct bituminous parking lot. Minimum 12" base material, minimum 3.5" asphalt (binder and top). 95% compaction. o Cleanly sawcut. o Crack fill and seal all asphalt joints and seams between old and new asphalt. o Remove earth. o Regrade areas within limit of work. o Loam and hydroseed all bare and disturbed areas. o Install silt sack and erosion control measures. o Install silt fence. o Remove existing sign poles and footings. o Salvage existing signs. o Install new sign poles, concrete footings. Install signs to new poles. o Install crushed stone and filter fabric. o Protect trees and vegetation to remain. o Adjust all utility covers and grates to finished grade. o Use caution around existing utilities. Record plans available upon request. o Pavement markings. Minimum two coats of paint. o Loam & hydroseed all disturbed areas. o Regrade lawn, as needed. Max 3:1 slope. o All utility covers shall be set to finish grade in newly reconstructed asphalt areas. o Reconstructed asphalt shall be maximum 4.5% running slope and minimum 1.5% cross slope. o All roots, debris, stones, rocks shall be removed under new asphalt. o Conform to all MAAB, ADA, State, Local, Federal requirements and regulations. o Provide safe and accessible site access at all times. o Contractor responsible for all traffic and safety elements throughout construction. Completion- 45 consecutive calendar days.

Award

Roads / Highways

$37,000.00

Public - City

Paving, Site Work

11

17

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
656
Active Projects
371
Bidding Soon
4,615
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2025

September 15, 2025

Project location map

15-21 Mill Rd, Chelmsford, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.