BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 23, 2025 at 8:00 PM

Updated September 24, 2025

Site work for a water / sewer project in Brainerd, Minnesota. Working plans call for site work for a water / sewer project.

Bid is cancelled This requirement is being cancelled as un-awardable. GENERAL Scope of Work The contractor shall furnish and install a new Northwoods forest themed play system drainage system and a pour in place rubber surface according to manufacturerrsquos specifications Engineered drawings of play system and associated components shall be included with quote The new play system will replace an existing outdated playground with sand fall material The existing playground removal will be completed by the Corps The work to be performed under this contract consists of furnishing all plant materials equipment supplies labor transportation and performing all work as required by the contract in accordance with federal state and local laws and regulations Location of Delivery The address for the work is US Army Corps of Engineers Gull Lake Recreation Area 10867 East Gull Lake Drive Brainerd MN 56401 Safety All materials supplied shall be in accordance with all state federal and local laws and regulations and the Corps of Engineers Safety and Health Manual EM38511 A copy of this manual can be found at httpswwwpublicationsusacearmymilPortals76EM203851 120_EFFECTIVE2015March2024pdf PreConstruction Meeting Prior to the start of work the government will schedule a preconstruction meeting in accordance with contract clause 5223626 The purpose of this meeting will be to discuss project schedule personnel safety security and general contract requirements Payment The contractor must submit an invoice in accordance with contract clause 522325 to the contracting officer or designated representative for payment Specifications Playground Equipment Description The play equipment supplied shall be Northwoods forest themed and incorporate natural features such as trees logs stones or other Northwoods forest related plants and animals Aesthetics Form and Function similar to recently installed playground at Cross Lake which include but are not limited to North Woods Nature Theme 24 play activities activities that are directly based off nature such as a rock and log climb wood suspension bridge stump climbs and timber crawl tunnel Pour in Place Rubber Surface please see ndash SOW Attachment 2 Accessibility Requirements Play equipment and surfacing and borders must be Architectural Barriers Act ABA compliant Materials Play equipment shall not include any natural or treated wood products or any painted wood material Equipment shall be molded plastic and metal Metal aspects shall be powder coated Hardware shall be stainless steel Activities or Events The play equipment shall include a minimum of 24 different activities or components Additional accessory components are allowed if main play equipment does not maximize the allowable play space Examples include mushroom climbers log step climbers stone climbers or forest animal spring toys Minimum requirements of play equipment 3 slides nature themed climber and both ground and raised level activities Ages the play system and any applicable components shall be designed for children ages 512 Capacity The play equipment shall accommodate a minimum of 45 users at one time Height Equipment must not exceed allowable height to prevent injury from recommended depth of pour in place fall material ie play structures cannot exceed the safe fall height rating of the PIP material as installed at the site Use Zone Total overall footprint The Maximum Use Zone is 56 feet by 40 feet The minimum use zone is 52 feet x 40 feet The play structure shall utilize the available space to the greatest extent possible while following all manufacturerrsquos specifications and current playground safety requirements Width limits cannot be exceeded due to existing trees adjacent to play site and potential impacts to cultural resources Fall Material Fall material shall be dark brown pour in place rubber surface installed according to manufacturerrsquos specifications no border Playground Safety Requirements The play equipment and all associated components must meet or exceed all current playground safety codes Playground Warranty In addition to the requirements of contract clause 5224621 the contractor shall provide its best commercially available warranty for the playground and associated components Playground Installation Work Area The contractor shall conduct its operations in a manner that protects the surrounding areas and maintains a clean working environment in accordance with contract clauses 522369 and 5223612 All construction debris shall be removed and disposed of offsite in accordance with local and state regulations Existing Playground The existing playground components and wooden border will be removed by the government before installation The playground shall be installed over the existing sand play area Ground disturbance for the installation of the new play system and pour and play fall material shall be limited to the recommended use zone Installation The Contractor shall install the new playground system and fall material during the hours of 0800430 Monday Friday The Contractor is responsible for receiving unloading and storage of the unassembled play system until it is installed Storage is not available on site until the week before installation 331 The playground and any accessory components shall be installed within the use zone according to the manufacturerrsquos specifications 35 Installation Completion The playground and accessories components shall be installed by 30 June 2026 Note for discussion Contractor must notify government a minimum of 2 weeks in advance of install date so that demolition of the existing playground can be completed

Final Planning

Water / Sewer

$250,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
25
Bidding Soon
434
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2025

March 23, 2026

Project location map

10867 E Gull Lake Dr, Brainerd, MN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.