Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 2, 2025 at 8:00 PM
Updated September 5, 2025
Site work and renovation of a civil project in Brainerd, Minnesota. Completed plans call for the renovation of a 11,688-square-foot water / sewer project; and for site work for a water / sewer project.
BPU has selected Bolton & Menk, Inc. to act as the Architect and Engineer (A&E). The primary objective of this project is to provide adequate backwash retention and reclaim capacity for long-term treatment of Brainerd's municipal water using technologies capable of meeting current and future needs. Brainerd Public Utilities (BPU) has current design documents (attached to this RFP) from October 2024. These documents will be used as the basis of design and will be used for rescoping the project with the selected CMAR to meet budget requirements for Brainerd. The major portions of the project include a new building that contains two 300,000-gallon backwash tanks, chemical room, electrical room, mechanical room, pumps, and piping with associated site work and yard piping. To meet budget allocations the project scope and tank size may be adjusted. The total estimated cost of the work to be completed is $5-6 million. Brainerd Public Utilities (BPU) is seeking proposals from qualified interested parties to provide Construction Management at Risk (CMAR) services for the Filter Backwash Reclamation Project. The project will consist of constructing a new backwash reclaim tank with a chemical room, electrical room, mechanical room, pumps, piping, and associated yardwork. The electrical and controls system for the plant will also be improved. The scope of work will be adjusted to meet the BPU budget. Brainerd Public Utilities plans to retain a CMAR firm to facilitate the cost evaluation, design, constructability, scheduling, and sequencing of work for the efficient use and proper allocation of available funds.
Post-Bid
Water / Sewer
$200,000.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 4, 2025
June 22, 2026
1520 Emma St, Brainerd, MN
Related To This Project
Brainerd, MN
Bid Date: Sep 04 2025
Brainerd, MN
Bid Date: Oct 15 2025
Brainerd, MN
Bid Date: Oct 08 2025
Brainerd, MN
--
Brainerd, MN
--
Brainerd, MN
--
Brainerd, MN
Bid Date: Aug 22 2025
Brainerd, MN
Bid Date: Aug 08 2025
Brainerd, MN
Bid Date: Jul 28 2025
Brainerd, MN
Bid Date: Jul 28 2025
Brainerd, MN
Bid Date: Jul 17 2025
Brainerd, MN
Bid Date: Jul 17 2025
Brainerd, MN
Bid Date: Jun 26 2025
Brainerd, MN
Bid Date: Jul 01 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
