BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 28, 2025 at 8:00 PM

Updated July 30, 2025

Site work and paving for a mixed-use development in Brainerd, Minnesota. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Reconstruct (bridge, central, mall/railyard segments) or resurface (west and east segments) the road Reconstruct curbs, gutters, raised medians and storm sewers Update signal systems Remove signal systems at 4th Ave. NE and Mill Ave. Realign and improve access at the Hwy 210 and Hwy 25/Mill Ave., includes two roundabouts Upgrade city utilities beneath the road Upgrade pedestrian sidewalks and approaches and reconstruct/connect the Cuyuna Lakes Trail Update the Mississippi River bridge As of July 28 , 2025 , This project is included in the State's 2025-2029 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$51,300,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
25
Bidding Soon
434
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2027

Project location map

MN-210, Brainerd, MN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.