Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 3, 2025 at 8:00 PM
Updated October 4, 2025
Site work for a water / sewer project in Arcadia, Florida. Completed plans call for site work for a water / sewer project.
The DeSoto County Board of County Commissioners are seeking formal Proposals from qualified firms and/or individuals to remove and replace existing 12" force main, plugging of existing road crossings and the construction of 4,494 linear fee of 18-inch HDPE force main within the FDOT right-of-way of State Road 31as indicated within the context of this Bid. SR-31 Force Main Replacement Project The DeSoto County Utility Department (DCU) wishes to receive formal bids from Contractors for the SR-31 Force Main Replacement Project. SCOPE Work includes the removal of existing 12" force main, plugging of existing road crossings and the construction of 4,494 linear fee of 18-inch HDPE force main within the FDOT right-of-way of State Road 31 south of SE County Road 760A, and associated, fittings, valves, and appurtenances and sod restoration. The bid also includes alternates intended to show the cost difference between 16-inch and 18-inch diameter pipe and PVC and HDPE material. BASIS OF AWARD The basis of award is the lowest responsible/responsive bidder for all work included in the Base Bid. GOVERNING SPECIFICATIONS All work shall be in conformance with the following: o Construction Plan Set o Project Specific Technical Specifications o DCU Utilities Standards Handbook o FDOT FY 25-26 Standard Plans for Road and Bridge Construction and applicable Interim Revisions (IRs) o FDOT FY 25-26 Standard Specification for Road and Bridge Construction. COUNTY NOTIFICATION The Contractor is required to notify the County at least 2 County business days prior to all workdays. All work to be performed between 8:00am and 5:00pm, Monday through Friday and on non-County holidays. TIME FRAME: All work shall be complete within eighty (80) calendar days of the notice to proceed. The total contract will be for ninety (90) calendar days which will allow time for County inspection and correction of deficiencies if noted. Question Deadline 08/12/2025 Direct inquiries to: Cindy Talamantez, CPPO, CPPB Purchasing Director DeSoto County Board of County Commissioners 201 East Oak Street, Suite 203 Arcadia, Florida 34266 863-993-4816 Office 863-993-4819 Fax c.talamantez@desotobocc.com
Award
Water / Sewer
$940,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 25, 2025
October 1, 2025
Multiple Locations, Arcadia, FL
Related To This Project
Arcadia, FL
Bid Date: Sep 22 2021
Arcadia, FL
Bid Date: Oct 22 2025
Arcadia, FL
--
Arcadia, FL
Bid Date: Sep 12 2025
Arcadia, FL
Bid Date: Sep 26 2025
Arcadia, FL
Bid Date: Nov 12 2025
Arcadia, FL
Bid Date: Oct 31 2025
Arcadia, FL
--
Arcadia, FL
Bid Date: Jul 16 2025
Arcadia, FL
Bid Date: Aug 05 2025
Arcadia, FL
Bid Date: Jun 10 2025
Arcadia, FL
Bid Date: Jun 16 2025
Arcadia, FL
Bid Date: Jun 05 2025
Arcadia, FL
Bid Date: Mar 01 2019
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
