Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 11, 2025 at 7:00 PM
Updated November 12, 2025
Site work, paving and outdoor lighting for a mixed-use development in Saint Augustine Beach, Florida. Working plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; bridge / tunnel; bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; and for outdoor lighting for a road / highway.
As of November 11, 2025, a general contractor has been awarded, but construction has not yet begun. A firm construction timeline has not been established. Counties: St. Johns Federal Aid No: D224-068-B; D225-077-B Road Name: SR 23 (First Coast Xway) Limits: From SR 9 (I-95) To E Of CR 2209 Project(s): 45307015201(*) Federal Aid No: D224068B Total Roadway Length: 2.564 Miles Total Bridge Length: 0.147 Miles Total Proposal Length: 2.711 Miles Contract Days: 1600 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 30 Days Please read the full advertisement Description: The Improvements under this Contract consist of milling & resurfacing, base work, shoulder treatment, drainage improvements, curb & gutters, lighting, highway signing, guardrail, box culverts, bridges, MSE walls, toll facilities, and other incidental construction on SR 23 (First Coast Xway) in St. Johns County from I-95 (SR 9) to east of CR 2209. Question Deadline 08/20/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 001 - Intermediate Bridge Construction / Grading - SR 23 (First Coast Xway)
Pre-Construction/Negotiated
Roads / Highways
$205,250,003.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 24, 2025
January 5, 2026
State Road 23, Saint Augustine Beach, FL
Related To This Project
Saint Augustine Beach, FL
Bid Date: Jul 31 2025
Saint Augustine Beach, FL
Bid Date: Aug 26 2025
Saint Augustine Beach, FL
Bid Date: Aug 27 2025
Saint Augustine Beach, FL
--
Saint Augustine Beach, FL
Bid Date: Sep 04 2025
Saint Augustine Beach, FL
Bid Date: Aug 21 2025
Saint Augustine Beach, FL
--
Saint Augustine Beach, FL
Bid Date: Sep 04 2025
Saint Augustine Beach, FL
Bid Date: Aug 27 2025
Saint Augustine Beach, FL
Bid Date: Aug 08 2025
Saint Augustine Beach, FL
--
Saint Augustine Beach, FL
Bid Date: Aug 15 2025
Saint Augustine Beach, FL
Bid Date: Jul 23 2025
Saint Augustine Beach, FL
Bid Date: Aug 19 2025
Saint Augustine Beach, FL
Bid Date: Aug 20 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
