Published August 4, 2025 at 8:00 PM

Updated August 5, 2025

Site work for a water / sewer project in Rock Island, Illinois. Completed plans call for site work for a water / sewer project.

Bid sewer replacement The contractor shall have 30 days to complete the work from the date of contract signing All questions shall be directed to the Construction Officer at 309-732-2906. Scope of Work The bidder shall submit a project plan using the design standards below that is in compliance with all applicable HUD, EPA, and State of Illinois regulations as well as all local building and zoning codes. The plan must include a clear project timeline and budget with line item costs. The contractor shall act as the general contractor for the project using subcontractors as required. Subcontractors that will be required should be clearly identified in the project plan. This project has had a new sewer lateral ran to the edge of the street. The previous sewer replacement will need a new cleanout added in the lateral within 5of the house. Replace all the existing orangeburg from the edge of the street out to the main with new PVC. Use approved saddle to tie in PVC to the main. If the old connection has to be abandoned then appropriate patch on the main will be required with concrete around the patch. The PVC line must be fully supported in undisturbed soil or compacted rock along the trench for the length of the new line. Inspection will be needed once connections have been made before back filling. The back fil will need to be fill sand and compacted in lifts leaving 12 for top soil. The yard will be graded and seeded when the projects finished. Any sections sidewalk taken out will need to be replaced. The street, curb, and gutter taken out shall be replaced blended back in to existing. Concrete can be used for the street repair blending to existing surface unless told otherwise by the City of Rock Island Public Works Division. For final street patch edges must be cut and squared up before pouring the final concrete. All remaining spoils will need to be removed from the site. There is also a waste line in the basement from the kitchen sink going to the main stack that will need to be replaced. Plumbing permit and excavation permit are required before digging begins.

Award

Water / Sewer

$18,251.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
83
Bidding Soon
1,159
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2025

September 1, 2025

Project location map

3417 9th St, Rock Island, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.